<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>MES Energy</title>
	<atom:link href="https://mese.gr/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://mese.gr/</link>
	<description>Eνεργειακές εφαρμογές</description>
	<lastBuildDate>Mon, 02 Mar 2026 08:19:06 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.1</generator>

<image>
	<url>https://mese.gr/wp-content/uploads/2021/11/logo-icon.png</url>
	<title>MES Energy</title>
	<link>https://mese.gr/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Maintenance of Cooling, Heating, and Fire-fighting Systems for the Municipal Buildings of the Municipality of Amarousion</title>
		<link>https://mese.gr/en/maintenance-of-cooling-heating-and-fire-fighting-systems-for-the-municipal-buildings-of-the-municipality-of-amarousion/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Mon, 02 Mar 2026 08:10:27 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=3001</guid>

					<description><![CDATA[<p>MES Energy S.A. has undertaken a further technical support and maintenance project for municipal infrastructure, as part of its partnership with the Municipality of Amarousion. More specifically, a public contract entitled ‘Maintenance of Cooling, Heating, and Fire-fighting Systems for the Municipal Buildings of the Municipality of Maroussi’ was signed, concerning the provision of preventive and...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/maintenance-of-cooling-heating-and-fire-fighting-systems-for-the-municipal-buildings-of-the-municipality-of-amarousion/">Maintenance of Cooling, Heating, and Fire-fighting Systems for the Municipal Buildings of the Municipality of Amarousion</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES Energy S.A. has undertaken a further technical support and maintenance project for municipal infrastructure, as part of its partnership with the Municipality of Amarousion.</p>
<p>More specifically, a public contract entitled ‘Maintenance of Cooling, Heating, and Fire-fighting Systems for the Municipal Buildings of the Municipality of Maroussi’ was signed, concerning the provision of preventive and corrective maintenance services for electromechanical installations across the building facilities of the Municipality of Amarousion.</p>
<p>The contract concerns cooling, heating and fire-fighting facilities and aims to ensure the smooth, safe and uninterrupted operation of municipal infrastructure, in accordance with the provisions of the relevant study and the terms of the contract.</p>
<p>The duration of the contract is set at five (5) years, with the aim of systematic technical support of the facilities throughout its validity.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/maintenance-of-cooling-heating-and-fire-fighting-systems-for-the-municipal-buildings-of-the-municipality-of-amarousion/">Maintenance of Cooling, Heating, and Fire-fighting Systems for the Municipal Buildings of the Municipality of Amarousion</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply &#038; Installation of Microgrid Photovoltaic Units at facilities of the Municipality of Arriana</title>
		<link>https://mese.gr/en/promitheia-kai-egkatastasi-photovoltaikwn-monadwn/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Fri, 27 Feb 2026 08:10:41 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=3003</guid>

					<description><![CDATA[<p>MES Energy S.A. has undertaken a further project concerning the implementation of modern energy infrastructure at a local government level, as part of its partnership with the Municipality of Arriana. More specifically, a public contract was signed entitled ‘Supply &#38; Installation of Microgrid Photovoltaic Units at facilities of the Municipality of Arriana’. The scope of...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/promitheia-kai-egkatastasi-photovoltaikwn-monadwn/">Supply &#038; Installation of Microgrid Photovoltaic Units at facilities of the Municipality of Arriana</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES Energy S.A. has undertaken a further project concerning the implementation of modern energy infrastructure at a local government level, as part of its partnership with the Municipality of Arriana.</p>
<p>More specifically, a public contract was signed entitled ‘Supply &amp; Installation of Microgrid Photovoltaic Units at facilities of the Municipality of Arriana’. The scope of the contract is defined as the supply, installation, and commissioning of equipment, which will lead to the energy upgrading of the facilities of the Municipality of Arriana, as well as its management.</p>
<p>The project aims to improve the energy management of the infrastructure through the utilisation of Renewable Energy Sources and the implementation of integrated microgrid technical solutions.</p>
<p>The contract, valued at €671,000.00 plus VAT, is expected to be completed within 12 months of its signing.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/promitheia-kai-egkatastasi-photovoltaikwn-monadwn/">Supply &#038; Installation of Microgrid Photovoltaic Units at facilities of the Municipality of Arriana</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ancillary Street Lighting Works Within the Intervention Area of the Municipality of Thebes</title>
		<link>https://mese.gr/en/municipality-of-thebes/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Mon, 16 Jun 2025 12:10:04 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2974</guid>

					<description><![CDATA[<p>MES Energy S.A. has undertaken another innovative project contributing to energy saving on behalf of Thebes Municipality. Specifically, a public contract titled &#8220;Ancillary Street Lighting Works within the Intervention Area of the Municipality of Thebes&#8221; was signed. Its purpose is to supply and install LED lighting fixtures and a management system to replace older, energy-intensive...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/municipality-of-thebes/">Ancillary Street Lighting Works Within the Intervention Area of the Municipality of Thebes</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES Energy S.A. has undertaken another innovative project contributing to energy saving on behalf of Thebes Municipality.<br />
Specifically, a public contract titled &#8220;Ancillary Street Lighting Works within the Intervention Area of the Municipality of Thebes&#8221; was signed. Its purpose is to supply and install LED lighting fixtures and a management system to replace older, energy-intensive luminaires currently installed on Thebes&#8217; main arteries and local roads. The aim is to achieve energy savings and enhance the aesthetic appearance of the streets where they will be installed, while also providing improved lighting quality for citizens&#8217; services.<br />
The contract, with a total value of €524,193.00 plus VAT, is expected to be completed within 15 months of its signing.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/municipality-of-thebes/">Ancillary Street Lighting Works Within the Intervention Area of the Municipality of Thebes</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>“Supply of Electric Vehicles and Chargers” within the framework of Call AT12 &#8220;E-mobility Actions for Municipalities”</title>
		<link>https://mese.gr/en/supply-of-electric-vehicles-and-chargers/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Fri, 13 Jun 2025 12:14:04 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2979</guid>

					<description><![CDATA[<p>MES Energy S.A., as part of the tender process for the &#8220;Supply of Electric Vehicles and Chargers&#8221; under Call AT12 &#8220;E-mobility Actions for Municipalities,&#8221; has undertaken the procurement of one (1) large 42-seat electric bus, including accessibility for people with disabilities (AMEA). The Municipality of Hersonissos will utilize the offered electric, urban-type bus to enhance...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-electric-vehicles-and-chargers/">“Supply of Electric Vehicles and Chargers” within the framework of Call AT12 &#8220;E-mobility Actions for Municipalities”</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES Energy S.A., as part of the tender process for the &#8220;Supply of Electric Vehicles and Chargers&#8221; under Call AT12 &#8220;E-mobility Actions for Municipalities,&#8221; has undertaken the procurement of one (1) large 42-seat electric bus, including accessibility for people with disabilities (AMEA).<br />
The Municipality of Hersonissos will utilize the offered electric, urban-type bus to enhance its municipal transportation system and serve the needs of vulnerable groups, as well as cater to cultural needs and activities.<br />
The contract, with a total value of €610,000 plus VAT, was signed on 28 April 2025.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-electric-vehicles-and-chargers/">“Supply of Electric Vehicles and Chargers” within the framework of Call AT12 &#8220;E-mobility Actions for Municipalities”</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Support in the preparation of the Plan on Energy Performance of Buildings and the Municipal Emission Reduction Plan on behalf of the Municipality of Dorida.</title>
		<link>https://mese.gr/en/energy-plan-performance-of-buildings/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Sun, 08 Dec 2024 12:49:22 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2960</guid>

					<description><![CDATA[<p>MES Energy undertook the project &#8220;Support in the preparation of the Plan on Energy Performance of Buildings and the Municipal Emissions Reduction Plan&#8221; on behalf of the Municipality of Dorida. The scope of the Contract includes, inter alia, a plan to achieve the energy saving target for public buildings as well as a report on...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/energy-plan-performance-of-buildings/">Support in the preparation of the Plan on Energy Performance of Buildings and the Municipal Emission Reduction Plan on behalf of the Municipality of Dorida.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES Energy undertook the project &#8220;Support in the preparation of the Plan on Energy Performance of Buildings and the Municipal Emissions Reduction Plan&#8221; on behalf of the Municipality of Dorida.</p>
<p>The scope of the Contract includes, inter alia, a plan to achieve the energy saving target for public buildings as well as a report on emission reduction calculations, in accordance with the standards of the institutional framework of the ERP.</p>
<p>More specifically, the first stage of implementation of the service concerns support in the preparation of the Plan on Energy Performance of Buildings (PEPB) through recording the demographic, social, economic and geographical characteristics of the Municipality, as well as its particular climatic characteristics, and then prioritising the Municipality&#8217;s building stock based on the necessity of actions to improve their energy performance.</p>
<p>The second stage of implementation of the service is related to support in the preparation of the Municipal Emission Reduction Plan (ERP) and includes the categorisation of the Municipality&#8217;s main activities and historical energy consumption data as well as the calculation of the carbon footprint, proposing actions aimed at realistically achieving the overall greenhouse gas emission reduction target.</p>
<p>MES Energy S.A. continues to be a valuable assistance in every new, innovative project that will actively contribute to the protection of the environment.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/energy-plan-performance-of-buildings/">Support in the preparation of the Plan on Energy Performance of Buildings and the Municipal Emission Reduction Plan on behalf of the Municipality of Dorida.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Preparation of the Municipal Emission Reduction Plan (ERP) on behalf of the Municipality of Heraklion, Crete</title>
		<link>https://mese.gr/en/preparation-of-the-municipal-emission-reduction-plan-erp-on-behalf-of-the-municipality-of-heraklion-crete/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Wed, 06 Nov 2024 12:47:39 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2958</guid>

					<description><![CDATA[<p>Mes Energy undertook the project &#8220;Preparation of the Municipal Emission Reduction Plan (ΜERP)&#8221; for the year 2024 on behalf of the Municipality of Heraklion, Crete. In particular, the company undertook the delivery of a method for preparing an inventory of direct and indirect greenhouse gas emissions as well as a spreadsheet for the inventory of...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/preparation-of-the-municipal-emission-reduction-plan-erp-on-behalf-of-the-municipality-of-heraklion-crete/">Preparation of the Municipal Emission Reduction Plan (ERP) on behalf of the Municipality of Heraklion, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Mes Energy undertook the project &#8220;Preparation of the Municipal Emission Reduction Plan (ΜERP)&#8221; for the year 2024 on behalf of the Municipality of Heraklion, Crete.</p>
<p>In particular, the company undertook the delivery of a method for preparing an inventory of direct and indirect greenhouse gas emissions as well as a spreadsheet for the inventory of reference emissions of the sectors under consideration, a unified recording of the Municipality&#8217;s interventions to reduce greenhouse gas emissions for the various energy consumption sectors, a report documenting any deviations from the targets of the ΜERP and proposals for corrective actions, a report on emission reduction calculations in accordance with the standards of the ΜERP institutional framework, a final ERP file as well as a recording spreadsheet for the purposes of monitoring the ΜERP.</p>
<p>MES Energy S.A. continues to actively support any innovative project that will actively contribute to the protection of the environment.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/preparation-of-the-municipal-emission-reduction-plan-erp-on-behalf-of-the-municipality-of-heraklion-crete/">Preparation of the Municipal Emission Reduction Plan (ERP) on behalf of the Municipality of Heraklion, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Participation in the the FIEA (International Federation of Automotive Experts)</title>
		<link>https://mese.gr/en/participation-in-the-the-fiea-international-federation-of-automotive-experts/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Fri, 01 Nov 2024 14:06:11 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2925</guid>

					<description><![CDATA[<p>We are happy to announce that Mr. George Kaplanis, participated in the FIEA (International Federation of Automotive Experts) General Assembly that was held in Athens this year. There, Mr. George Kaplanis presented “Hydrogen Technologies in Transport Applications”. The attendees’ interest was memorable and the discussion continued with emphasisespecially on H technologies, as well as for...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-the-fiea-international-federation-of-automotive-experts/">Participation in the the FIEA (International Federation of Automotive Experts)</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We are happy to announce that Mr. George Kaplanis, participated in the FIEA (International Federation of Automotive Experts) General Assembly that was held in Athens this year.<br />
There, Mr. George Kaplanis presented “Hydrogen Technologies in Transport Applications”.</p>
<p>The attendees’ interest was memorable and the discussion continued with emphasisespecially on H technologies, as well as for the 1st Pilot Green Hydrogen Refueling Station that was designed, engineered, and constructed in Athens by MES Energy S.A.</p>
<p>MES Energy S.A. is constantly pioneering and leading significant projects on H Technologies, RES, and EV Mobility in Greece, and is always seeking to share and implement expertise know-how in crucial, for our country, projects.<strong><em><br />
</em></strong></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-the-fiea-international-federation-of-automotive-experts/">Participation in the the FIEA (International Federation of Automotive Experts)</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Green Morning with the EEA and Norway Grants</title>
		<link>https://mese.gr/en/green-morning-with-the-eea-and-norway-grants/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Fri, 27 Sep 2024 19:09:03 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2912</guid>

					<description><![CDATA[<p>On 25/09/2024, MES Energy S.A. had a productive and inspiring “Green Morning with the EEA and Norway Grants” in Oslo, organised by Innovation Norway in the context of Oslo Innovation Week. Dr Christina Chatzipoulka represented our company in interesting discussions on circular economy, green transition and future collaborations! Always a pleasure to be part of...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/green-morning-with-the-eea-and-norway-grants/">Green Morning with the EEA and Norway Grants</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="xdj266r x11i5rnm xat24cr x1mh8g0r x1vvkbs x126k92a">
<div dir="auto">On 25/09/2024, MES Energy S.A. had a productive and inspiring “Green Morning with the EEA and Norway Grants” in Oslo, organised by Innovation Norway in the context of Oslo Innovation Week.</div>
<div dir="auto"></div>
<div dir="auto">Dr Christina Chatzipoulka represented our company in interesting discussions on circular economy, green transition and future collaborations!</div>
<div dir="auto"></div>
<div dir="auto">Always a pleasure to be part of green solutions!</div>
</div>
<p>The post <a rel="nofollow" href="https://mese.gr/en/green-morning-with-the-eea-and-norway-grants/">Green Morning with the EEA and Norway Grants</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Energy Upgrade of Street Lighting of the Municipality of Agios Dimitrios</title>
		<link>https://mese.gr/en/energy-upgrade-of-street-lighting-of-the-municipality-of-agios-dimitrios/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Wed, 21 Aug 2024 10:33:54 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2905</guid>

					<description><![CDATA[<p>MES Energy S.A. undertook another innovative project to contribute to energy saving on behalf of the Municipality of Agios Dimitrios. In particular, on 20 August 20 2024, the public procurement contract entitled &#8220;Energy Upgrade of Street Lighting&#8221; of the Municipality of Agios Dimitrios was signed, with the aim of improving the energy efficiency of municipal...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/energy-upgrade-of-street-lighting-of-the-municipality-of-agios-dimitrios/">Energy Upgrade of Street Lighting of the Municipality of Agios Dimitrios</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES Energy S.A. undertook another innovative project to contribute to energy saving on behalf of the Municipality of Agios Dimitrios.</p>
<p>In particular, on 20 August 20 2024, the public procurement contract entitled &#8220;Energy Upgrade of Street Lighting&#8221; of the Municipality of Agios Dimitrios was signed, with the aim of improving the energy efficiency of municipal street lighting, through the replacement of conventional luminaires and lamps with new modern technology luminaires and lamps as well as the installation of equipment to control the operation of the luminaires.</p>
<p>More specifically, MES Energy S.A. will supply and install 4553 LED road luminaires of modern technology, luminaires of various types and 6 luminaire brackets. At the same time, it undertakes the removal of 4553 luminaires from an arm or from the top of an installed mast, the dismantling of 158 existing luminaires, the removal of 6 arms in areas where their existence is not required and the rotation of 108 arms on HEDNO poles in order to improve the lighting produced.</p>
<p>The contract with a total value of €2,154,153.50 plus VAT was signed on 20 August 2024 and is expected to be completed within 14 months from its signing.</p>
<p>&nbsp;</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/energy-upgrade-of-street-lighting-of-the-municipality-of-agios-dimitrios/">Energy Upgrade of Street Lighting of the Municipality of Agios Dimitrios</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Advisory services of the Act “Digital Transformation Actions of the Municipality of Marathonas</title>
		<link>https://mese.gr/en/advisory-services-of-the-act-digital-transformation-actions-of-the-municipality-of-marathonas/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Fri, 09 Aug 2024 15:26:43 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2861</guid>

					<description><![CDATA[<p>MES Energy S.A. undertook another innovative project in the context of providing the specialised services of an energy consultant for a public entity on behalf of the Municipality of Marathonas, Attica. In particular, MES Energy undertook the project &#8220;Advisory Services of the Operation &#8220;Digital Transformation Actions of the Municipality of Marathonas&#8221; with the object of...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/advisory-services-of-the-act-digital-transformation-actions-of-the-municipality-of-marathonas/">Advisory services of the Act “Digital Transformation Actions of the Municipality of Marathonas</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES Energy S.A. undertook another innovative project in the context of providing the specialised services of an energy consultant for a public entity on behalf of the Municipality of Marathonas, Attica.</p>
<p>In particular, MES Energy undertook the project &#8220;Advisory Services of the Operation &#8220;Digital Transformation Actions of the Municipality of Marathonas&#8221; with the object of executing actions to mature the operation (recording the strategic choices of the actions of the Municipality, related operations of the Municipality of Marathon that have been submitted and/or approved in other financial instruments, etc.), in accordance with the planning of the action that was put to public consultation by the Ministry of Digital Governance, during the stage before the submission in the context of the relevant invitation, the execution of technical and financial support actions (technical specifications and requirements, market research and costing of actions, calculation of transaction net revenues, etc.) that may be required for the completeness of the transaction file to be submitted, the procedures regarding monitoring and risk assessment actions during the stages of the tender before the signing of the Contract of the main sub-project, the detailed determination of the tasks required for the maturation of the act to be submitted, the communication and cooperation with all the involved services of the Municipality for the successful submission and approval of the act, the identification of risks or deviations and the taking of corrective measures to control the milestones, the technical and financial support services during the preparation by the municipality of the tender procedures of the main sub-project for their valid and timely completion.</p>
<p>Through this project the Municipality of Marathonas aims to improve the management and functionality of the urban environment through the adoption of more efficient, innovative and high-quality services for the benefit of residents, visitors and businesses. At the same time, by leveraging new technologies for the Internet of Things (IoT), it aims to strengthen the demand for broadband services.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/advisory-services-of-the-act-digital-transformation-actions-of-the-municipality-of-marathonas/">Advisory services of the Act “Digital Transformation Actions of the Municipality of Marathonas</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Signature of the contract for the &#8220;Supply of electrical and lighting materials for the improvement of the energy efficiency of the existing lighting network of the city&#8221; in the Municipality of Maroussi.</title>
		<link>https://mese.gr/en/signature-of-the-contract-for-the-supply-of-electrical-and-lighting-materials-for-the-improvement-of-the-energy-efficiency-of-the-existing-lighting-network-of-the-city-in-the-municipality-of-marou/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Tue, 28 May 2024 06:30:15 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2692</guid>

					<description><![CDATA[<p>MES Energy S.A. undertook the supply and installation of materials and electroluminescent materials for the improvement of the energy efficiency of the existing lighting network of the Municipality of Maroussi. More specifically, the company undertook the supply and installation of 5,500 new LED luminaires for road-type luminaires on metal, wooden and concrete masts, top luminaires...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/signature-of-the-contract-for-the-supply-of-electrical-and-lighting-materials-for-the-improvement-of-the-energy-efficiency-of-the-existing-lighting-network-of-the-city-in-the-municipality-of-marou/">Signature of the contract for the &#8220;Supply of electrical and lighting materials for the improvement of the energy efficiency of the existing lighting network of the city&#8221; in the Municipality of Maroussi.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">MES Energy S.A. undertook the supply and installation of materials and electroluminescent materials for the improvement of the energy efficiency of the existing lighting network of the Municipality of Maroussi.</span></p>
<p><span style="font-weight: 400;">More specifically, the company undertook the supply and installation of 5,500 new LED luminaires for road-type luminaires on metal, wooden and concrete masts, top luminaires on metal masts as well as the supply of twenty (20) brackets for HEDNO masts in places where there is an existing type of luminaire &#8220;cap&#8221;. </span></p>
<p><span style="font-weight: 400;">In addition, the company undertook and installed wireless controllers of Zhaga-type luminaires for the supervision and management of 800 luminaires via cloud software and the installation of 225 pieces of voltage monitors in public pillar and SSL (Street and Square Lighting)-HEDNO.</span></p>
<p><span style="font-weight: 400;">Finally, the company undertook the supply of electrical materials to be used by the municipal workers of the Department of Environment and Quality of Life of the Municipality of Maroussi to cover the needs of the Municipality for street lighting and materials for the maintenance and repair of buildings, as well as lamps and other equipment.</span></p>
<p><span style="font-weight: 400;">The contract worth €5,603,980.98, including VAT, was signed on Monday March 4th, 2024 and is expected to be completed within 48 months from the date of signature in terms of supply and installation. The funding body is the Municipality of Maroussi.</span></p>
<p><span style="font-weight: 400;">The Municipality of Maroussi is another municipality in Attica that protects the environment and promotes sustainable development. LED lighting not only enhances visibility and safety on the roads, but also makes a significant contribution to reducing energy consumption and overall public expenditure savings.</span></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/signature-of-the-contract-for-the-supply-of-electrical-and-lighting-materials-for-the-improvement-of-the-energy-efficiency-of-the-existing-lighting-network-of-the-city-in-the-municipality-of-marou/">Signature of the contract for the &#8220;Supply of electrical and lighting materials for the improvement of the energy efficiency of the existing lighting network of the city&#8221; in the Municipality of Maroussi.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MES Energy S.A. undertook the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &#038; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221;</title>
		<link>https://mese.gr/en/mes-energy-s-a-undertook-the-supply-and-installation-of-renewable-and-alternative-energy-technologies-and-metering-equipment-in-social-infrastructures-of-the-municipal-water-supply-and-sewerage-com/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Mon, 06 May 2024 06:49:01 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2704</guid>

					<description><![CDATA[<p>MES Energy S.A. undertook the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &#38; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-s-a-undertook-the-supply-and-installation-of-renewable-and-alternative-energy-technologies-and-metering-equipment-in-social-infrastructures-of-the-municipal-water-supply-and-sewerage-com/">MES Energy S.A. undertook the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &#038; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221;</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">MES Energy S.A. undertook the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &amp; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221;.</span></p>
<p><span style="font-weight: 400;">More specifically, the company undertook the supply and installation of a Green H2 Production Unit which will consist of an electrolytic compressor unit and all the additional auxiliary subsystems (Water Deionization Unit, complete automation panel, etc.and so on), the supply and installation of twelve (12) stand-alone luminaires for the lighting needs of the Municipal Water Supply and Sewerage Company as well as the supply and installation of one (1) multifunctional column for monitoring and facilitating its activities.</span></p>
<p><span style="font-weight: 400;">The contract worth €279,850.00 was signed on Thursday December14th, 2023 and is expected to be completed within four months of its signature.</span></p>
<p><span style="font-weight: 400;">The contract is included in sub-project No 5 &amp; 2 of the Act: &#8220;Demonstrated Use of Renewable &amp; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; is implemented in the framework of the Programme ΧΜ ΕΟΧ 2014-2021 &#8220;Renewable Energy Sources, Energy Efficiency, Energy Security&#8221;/GR-Energy with co-funding from the EEA and Norway Grants (Iceland, Liechtenstein and Norway) (75%) and from the Public Investment Programme of the Hellenic Republic (25%).</span></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-s-a-undertook-the-supply-and-installation-of-renewable-and-alternative-energy-technologies-and-metering-equipment-in-social-infrastructures-of-the-municipal-water-supply-and-sewerage-com/">MES Energy S.A. undertook the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &#038; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221;</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Signature of the Contract for the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &#038; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama”</title>
		<link>https://mese.gr/en/signature-of-the-contract-for-the-supply-and-installation-of-renewable-and-alternative-energy-technologies-and-metering-equipment-in-social-infrastructures-of-the-municipal-water-supply-and-sewerage/</link>
		
		<dc:creator><![CDATA[Tonia Lioliou]]></dc:creator>
		<pubDate>Sun, 05 May 2024 06:39:16 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2698</guid>

					<description><![CDATA[<p>MES Energy S.A. undertook the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &#38; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/signature-of-the-contract-for-the-supply-and-installation-of-renewable-and-alternative-energy-technologies-and-metering-equipment-in-social-infrastructures-of-the-municipal-water-supply-and-sewerage/">Signature of the Contract for the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &#038; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama”</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">MES Energy S.A. undertook the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &amp; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221;.</span></p>
<p><span style="font-weight: 400;">More specifically, the company undertook the creation of a microgrid of RES and Alternative Technologies at the Municipal Water Supply and Sewerage Company of Drama facilities and specifically the creation of an Energy Saving System, an Autonomous Photovoltaic Plant with a capacity of 1000 kW, LED perimeter lighting of Biological Treatment Plant and LED lighting of Pumping Stations/Tanks, the supply and installation of an Intermittent Hydrogen Supply System, the supply of two (2) electric vehicles and seven (7) electric bicycles with accompanying charging stations as well as the supply and installation of metering equipment.</span></p>
<p><span style="font-weight: 400;">The contract worth €664,500.00 was signed on Friday June 30th, 2023 and is expected to be completed within four months of its signing.</span></p>
<p><span style="font-weight: 400;">The contract is included in sub-project No 1 &amp; 2 of the Act: &#8220;Demonstrated Use of Renewable &amp; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; which has been included in the Operational Programme &#8220;GR-Energy 2014-2021&#8221;, Thematic Area &#8220;Renewable Energy Sources, Energy Efficiency, Energy Security&#8221; of the EEA Financial Mechanism (EFA) on the basis of the Integration Decision no. 66 XM EEA-13/7/2021 (Incorporation of the Act &#8220;Demonstration of the use of Renewable &amp; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; with code MIS 5074878 in the Operational Programme &#8220;GREnergy 2014-2021&#8221; of the Minister for the Environment and Energy.</span></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/signature-of-the-contract-for-the-supply-and-installation-of-renewable-and-alternative-energy-technologies-and-metering-equipment-in-social-infrastructures-of-the-municipal-water-supply-and-sewerage/">Signature of the Contract for the &#8220;Supply and Installation of Renewable and Alternative Energy Technologies and Metering Equipment in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama&#8221; in the framework of the project &#8220;Demonstration Use of Renewable &#038; Alternative Energy Technologies in Social Infrastructures of the Municipal Water Supply and Sewerage Company of Drama”</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Development of a Pilot Backup Hydrogen Sypply System</title>
		<link>https://mese.gr/en/development-of-a-pilot-backup-hydrogen-sypply-system/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Thu, 30 Nov 2023 13:28:54 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2624</guid>

					<description><![CDATA[<p>Within the framework of Collaborative Innovation Formations, a pilot Backup Hydrogen Supply System was developed by MES ENERGY S.A.. The system functions as an uninterrupted power supply capable of delivering electrical energy to loads using hydrogen as a fuel. Primarily intended for the building sector, it can also be applied in various other appliications, such...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/development-of-a-pilot-backup-hydrogen-sypply-system/">Development of a Pilot Backup Hydrogen Sypply System</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Within the framework of Collaborative Innovation Formations, a pilot Backup Hydrogen Supply System was developed by MES ENERGY S.A.. The system functions as an uninterrupted power supply capable of delivering electrical energy to loads using hydrogen as a fuel. Primarily intended for the building sector, it can also be applied in various other appliications, such as integrating with Renewable Energy Systems (e.g., Photovoltaic Systems).</p>
<p>The pilot system, which is part of the research program: Bussiness Development Plans for Renewable Energy Sources and Energy Savings Innovations for Application in Almost Zero-Energy Infrastructures, and was developed in the spring of 2023, consists of the following:</p>
<ul>
<li>Air-cooled hydrogen fuel cell with a polymer proton exchange membrane (PEM)</li>
<li>Closed-type battery array for energy storage</li>
<li>Pressurized hydrogen gas cylinders</li>
<li>Touchscreen with a microprocessor</li>
<li>DC load bank, integrated to simulate electrical infrastructure loads</li>
</ul>
<p><img fetchpriority="high" decoding="async" class="alignnone wp-image-2613" src="https://mese.gr/wp-content/uploads/2023/11/1-1-211x300.png" alt="" width="477" height="678" srcset="https://mese.gr/wp-content/uploads/2023/11/1-1-211x300.png 211w, https://mese.gr/wp-content/uploads/2023/11/1-1.png 516w" sizes="(max-width: 477px) 100vw, 477px" />         <img decoding="async" class="alignnone wp-image-2607" src="https://mese.gr/wp-content/uploads/2023/11/5-211x300.png" alt="" width="477" height="678" srcset="https://mese.gr/wp-content/uploads/2023/11/5-211x300.png 211w, https://mese.gr/wp-content/uploads/2023/11/5.png 516w" sizes="(max-width: 477px) 100vw, 477px" /></p>
<p><img decoding="async" class="alignnone wp-image-2605" src="https://mese.gr/wp-content/uploads/2023/11/3-300x214.png" alt="" width="477" height="340" srcset="https://mese.gr/wp-content/uploads/2023/11/3-300x214.png 300w, https://mese.gr/wp-content/uploads/2023/11/3.png 555w" sizes="(max-width: 477px) 100vw, 477px" />         <img decoding="async" class="alignnone wp-image-2603" src="https://mese.gr/wp-content/uploads/2023/11/4-300x216.png" alt="" width="472" height="340" srcset="https://mese.gr/wp-content/uploads/2023/11/4-300x216.png 300w, https://mese.gr/wp-content/uploads/2023/11/4.png 549w" sizes="(max-width: 472px) 100vw, 472px" /></p>
<p>During the spring and summer of 2023, the operation of the backup system was monitored and recorded while supplying electricity to building loads, specifically a school building, an office, and a residence. A DC electronic load was used to simulate the infastructure loads.Parameters such as voltage, current, and power supplied by the backup system to the electronic load were recorded during system operation.</p>
<p>From the implementation and monitoring of the system, the following capabilities of the backup system were identified:</p>
<ul>
<li>Provision of the desired power level without fluctuations for as long as needed</li>
<li>Quick response to changes in the desired power</li>
<li>Supply of energy to infrastructure whenever necessary, e.g., during power outages, provided there is sufficient stored fuel</li>
</ul>
<p>Due to these capabilities, it is inferred that the system has the potential to replace conventional backup systems like Diesel Fuel Cell (HFC) generators, offering advantages such as:</p>
<ul>
<li>Reduction or elimination of CO₂ emissions through the use of green hydrogen</li>
<li>Lower noise levels</li>
<li>Lower operational expenses mainly due to reduced maintenance requirements</li>
</ul>
<p>As an example, it was calculated that replacing a conventional Diesel Fuel Cell backup system with the proposed hydrogen backup system, in the case of a school building, could result in an annual operating cost reduction of 610 EUR and a reduction of annual CO₂ emissions by 400 kg.</p>
<p>More results can be found in the following scientific publication:</p>
<p>Tziritas, D.; Stavrakakis, G.M.; Bakirtzis, D.; Kaplanis, G.; Patlitzianas, K.; Damasiotis, M.; Zervas, P.L. Techno-Economic Analysis of a Hydrogen-Based Power Supply Backup System for Tertiary Sector Buildings: A Case Study in Greece. Sustainability 2023, 15, 7646. https://doi.org/10.3390/su15097646</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/development-of-a-pilot-backup-hydrogen-sypply-system/">Development of a Pilot Backup Hydrogen Sypply System</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MES ENERGY S.A. Undertook the Upgrade of Road Lighting in the Municipality of Distomo Arachova Antikyra</title>
		<link>https://mese.gr/en/mes-energy-s-a-undertook-the-upgrade-of-road-lighting-in-the-municipality-of-distomo-arachova-antikyra/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Fri, 24 Nov 2023 12:17:58 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2596</guid>

					<description><![CDATA[<p>MES ENERGY S.A. undertook the supply and installation of 632 LED lighting fixtures in the Municipality of Distomo Arachova Antikyra. Specifically, 537 road-type luminaires and 95 traditional lantern-type fixtures will be strategically placed. The procurement also includes a remote management system with integrated &#8220;cloud&#8221; technology. The contract, worth €578,493, was signed on Wednesday, November 15,...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-s-a-undertook-the-upgrade-of-road-lighting-in-the-municipality-of-distomo-arachova-antikyra/">MES ENERGY S.A. Undertook the Upgrade of Road Lighting in the Municipality of Distomo Arachova Antikyra</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. undertook the supply and installation of 632 LED lighting fixtures in the Municipality of Distomo Arachova Antikyra. Specifically, 537 road-type luminaires and 95 traditional lantern-type fixtures will be strategically placed. The procurement also includes a remote management system with integrated &#8220;cloud&#8221; technology. The contract, worth €578,493, was signed on Wednesday, November 15, 2023, and is expected to be completed within nine months.</p>
<p>The project is co-funded by the National Recovery and Resilience Plan &#8220;Greece 2.0&#8221; and the European Union &#8211; NextGenerationEU.</p>
<div class="w-full text-token-text-primary border-b border-black/10 gizmo:border-0 dark:border-gray-900/50 gizmo:dark:border-0 bg-gray-50 gizmo:bg-transparent dark:bg-[#444654] gizmo:dark:bg-transparent" data-testid="conversation-turn-5">
<div class="p-4 gizmo:py-2 justify-center text-base md:gap-6 md:py-6 m-auto">
<div class="flex flex-1 gap-4 text-base mx-auto md:gap-6 gizmo:gap-3 gizmo:md:px-5 gizmo:lg:px-1 gizmo:xl:px-5 md:max-w-2xl lg:max-w-[38rem] gizmo:md:max-w-3xl gizmo:lg:max-w-[40rem] gizmo:xl:max-w-[48rem] xl:max-w-3xl } group">
<div class="relative flex w-[calc(100%-50px)] flex-col gizmo:w-full lg:w-[calc(100%-115px)] agent-turn">
<div class="flex-col gap-1 md:gap-3">
<div class="flex flex-grow flex-col max-w-full gap-3 gizmo:gap-0">
<div class="min-h-[20px] text-message flex flex-col items-start gap-3 whitespace-pre-wrap break-words [.text-message+&amp;]:mt-5 overflow-x-auto" data-message-author-role="assistant" data-message-id="809e792b-c1db-4159-ac4d-c1f37c98302e">
<div class="markdown prose w-full break-words dark:prose-invert light">
<p>The Municipality of Distomo Arachova Antikyra is dedicated to improving road safety through a comprehensive upgrade of road lighting, with a specific focus on energy savings.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-s-a-undertook-the-upgrade-of-road-lighting-in-the-municipality-of-distomo-arachova-antikyra/">MES ENERGY S.A. Undertook the Upgrade of Road Lighting in the Municipality of Distomo Arachova Antikyra</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Municipality of Ios: The Installation of 114 Autonomous LED Lighting Fixtures has been Completed</title>
		<link>https://mese.gr/en/municipality-of-ios-the-installation-of-114-autonomous-led-lighting-fixtures-has-been-completed/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Mon, 20 Nov 2023 09:29:53 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2503</guid>

					<description><![CDATA[<p>MES ENERGY S.A. has successfully and on schedule completed all individual tasks associated with upgrading the street lighting on key road axes in the Municipality of Ios. The project has now entered the phase of guaranteed operation. Throughout this period, the company will ensure uninterrupted operation by conducting planned maintenance tasks and addressing any potential...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/municipality-of-ios-the-installation-of-114-autonomous-led-lighting-fixtures-has-been-completed/">Municipality of Ios: The Installation of 114 Autonomous LED Lighting Fixtures has been Completed</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">MES ENERGY S.A. has successfully and on schedule completed all individual tasks associated with upgrading the street lighting on key road axes in the Municipality of Ios. The project has now entered the phase of guaranteed operation. Throughout this period, the company will ensure uninterrupted operation by conducting planned maintenance tasks and addressing any potential damages that may occur.</span></p>
<p><img decoding="async" class="wp-image-2510 aligncenter" src="https://mese.gr/wp-content/uploads/2023/11/thumbnail_IMG_9627-εδ-240x300.jpg" alt="" width="428" height="535" srcset="https://mese.gr/wp-content/uploads/2023/11/thumbnail_IMG_9627-εδ-240x300.jpg 240w, https://mese.gr/wp-content/uploads/2023/11/thumbnail_IMG_9627-εδ-820x1024.jpg 820w, https://mese.gr/wp-content/uploads/2023/11/thumbnail_IMG_9627-εδ.jpg 1920w" sizes="(max-width: 428px) 100vw, 428px" /></p>
<p><span style="font-weight: 400;">The 114 autonomous LED luminaires, powered by batteries charged using a PV panel placed on their pole, have been primarily installed at key intersections of the national road network. They are strategically positioned in areas with poor visibility and challenging driving conditions, as well as on narrow roads, particularly in the harbor area where pedestrian and vehicle traffic is high.</span></p>
<p><img decoding="async" class="wp-image-2505 aligncenter" src="https://mese.gr/wp-content/uploads/2023/11/thumbnail_502cd0db-0e7e-49d3-b805-8a03090a1a3b-εδ-240x300.jpg" alt="" width="428" height="535" srcset="https://mese.gr/wp-content/uploads/2023/11/thumbnail_502cd0db-0e7e-49d3-b805-8a03090a1a3b-εδ-240x300.jpg 240w, https://mese.gr/wp-content/uploads/2023/11/thumbnail_502cd0db-0e7e-49d3-b805-8a03090a1a3b-εδ.jpg 460w" sizes="(max-width: 428px) 100vw, 428px" /></p>
<p><span style="font-weight: 400;">With this initiative, the municipality of Ios actively contributes to environmental protection and promotes sustainable development. LED lighting not only enhances visibility and safety on the roads but also makes a significant contribution to reducing energy consumption and overall public expenditure savings.</span></p>
<p>Read the Municipality&#8217;s announcement here: <a href="http://www.ios.gr/%CE%B5%CF%81%CE%B3%CE%B1%CF%83%CE%AF%CE%B5%CF%82-%CE%B5%CE%B3%CE%BA%CE%B1%CF%84%CE%AC%CF%83%CF%84%CE%B1%CF%83%CE%B7%CF%82-%CF%84%CF%89%CE%BD-114-%CE%B1%CF%85%CF%84%CF%8C%CE%BD%CE%BF%CE%BC%CF%89%CE%BD/">www.ios.gr/εργασίες-εγκατάστασης-των-114-αυτόνομων/ </a></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/municipality-of-ios-the-installation-of-114-autonomous-led-lighting-fixtures-has-been-completed/">Municipality of Ios: The Installation of 114 Autonomous LED Lighting Fixtures has been Completed</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Municipality of Chania: The First of the Five Electric Buses has been Delivered</title>
		<link>https://mese.gr/en/municipality-of-chania-the-first-of-the-five-electric-buses-has-been-delivered/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Thu, 05 Oct 2023 15:23:29 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2264</guid>

					<description><![CDATA[<p>On Wednesday, October 4, 2023, MES ENERGY S.A. delivered the first of the five state-of-the-art electric buses that were ordered by the Municipality of Chania. The delivery of the remaining buses is expected to follow shortly. Present at the bus presentation were Chania&#8217;s Mayor, Mr. Panagiotis Simandirakis, Deputy Mayors Mr. Tasos Aloglou, Mr. Michalis Kalogridakis,...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/municipality-of-chania-the-first-of-the-five-electric-buses-has-been-delivered/">Municipality of Chania: The First of the Five Electric Buses has been Delivered</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">On Wednesday, October 4, 2023, MES ENERGY S.A. delivered the first of the five state-of-the-art electric buses that were ordered by the Municipality of Chania. The delivery of the remaining buses is expected to follow shortly.</span></p>
<p><img decoding="async" class="alignnone wp-image-2227" src="https://mese.gr/wp-content/uploads/2023/10/DSC_0055-1-300x200.jpg" alt="" width="990" height="660" srcset="https://mese.gr/wp-content/uploads/2023/10/DSC_0055-1-300x200.jpg 300w, https://mese.gr/wp-content/uploads/2023/10/DSC_0055-1-1024x683.jpg 1024w" sizes="(max-width: 990px) 100vw, 990px" /></p>
<p><span style="font-weight: 400;">Present at the bus presentation were Chania&#8217;s Mayor, Mr. Panagiotis Simandirakis, Deputy Mayors Mr. Tasos Aloglou, Mr. Michalis Kalogridakis, Mr. Stelios Michailakis, and Mr. Michalis Tsoupakis, representatives from the contracting company MES ENERGY S.A. and TAM-EUROPE, along with the CEO of the Municipal Enterprise KYDON S.A., Mr. Charalambos Litos.</span></p>
<p><img decoding="async" class="alignnone wp-image-2267" src="https://mese.gr/wp-content/uploads/2023/10/DSC_0170-2-300x200.jpg" alt="" width="990" height="660" srcset="https://mese.gr/wp-content/uploads/2023/10/DSC_0170-2-300x200.jpg 300w, https://mese.gr/wp-content/uploads/2023/10/DSC_0170-2-1024x683.jpg 1024w" sizes="(max-width: 990px) 100vw, 990px" /></p>
<p><span style="font-weight: 400;">The new electric buses can transport at least forty passengers, including minimum 15 seated, with provisions for a wheelchair user and are designed to provide maximum comfort for all. They also feature ramps to facilitate boarding and disembarking for individuals using wheelchairs. With a range of over 150 kilometers per charge, these buses will be used for Chania&#8217;s municipal public transportation system to connect peripheral parking areas with the city center.</span></p>
<p><img decoding="async" class="alignnone wp-image-2229" src="https://mese.gr/wp-content/uploads/2023/10/DSC_0209-300x200.jpg" alt="" width="990" height="660" srcset="https://mese.gr/wp-content/uploads/2023/10/DSC_0209-300x200.jpg 300w, https://mese.gr/wp-content/uploads/2023/10/DSC_0209-1024x683.jpg 1024w" sizes="(max-width: 990px) 100vw, 990px" /></p>
<p><span style="font-weight: 400;">Kostis Terzis, CEO of MES ENERGY S.A., expressed his enthusiasm, saying, &#8220;<em>We are delighted to receive the first of the five purely electric buses that will be part of the Chania Municipality&#8217;s fleet. These eight-meter buses accomodate 15 seated and 27 standing passengers, with provisions for individuals with disabilities. Depending on the conditions, the buses can cover up to 150 kilometers per day. I hope that the residents and visitors of Chania will appreciate this new, clean, and citizen-friendly technology</em>.&#8221;</span></p>
<p><iframe title="Κωστής Τερζής - διευθύνων σύμβουλος αναδόχου εταιρίας" width="640" height="360" src="https://www.youtube.com/embed/18EDrh8zBAU?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe></p>
<p><span style="font-weight: 400;">The project is entirely funded by the &#8220;Antonis Tritsis&#8221; program, which aims to upgrade the infrastructure of Local Government Organizations with a focus on sustainable development. The same contract also includes two fast electric vehicle (EV) charging stations capable of serving eight EVs simultaneously, along with an electric street and sidewalk cleaner.</span></p>
<p><img decoding="async" class="alignnone wp-image-2235" src="https://mese.gr/wp-content/uploads/2023/10/DSC_0159-1-300x200.jpg" alt="" width="990" height="660" srcset="https://mese.gr/wp-content/uploads/2023/10/DSC_0159-1-300x200.jpg 300w, https://mese.gr/wp-content/uploads/2023/10/DSC_0159-1-1024x683.jpg 1024w" sizes="(max-width: 990px) 100vw, 990px" /></p>
<p><span style="font-weight: 400;">The procurement of these six vehicles and two fast chargers represents the initial significant step toward a broader and integrated approach to sustainable mobility for the Municipality of Chania, with a particular emphasis on promoting electric mobility.</span></p>
<p><img decoding="async" class="alignnone wp-image-2241" src="https://mese.gr/wp-content/uploads/2023/10/DSC_0139-1-300x200.jpg" alt="" width="461" height="307" srcset="https://mese.gr/wp-content/uploads/2023/10/DSC_0139-1-300x200.jpg 300w, https://mese.gr/wp-content/uploads/2023/10/DSC_0139-1-1024x683.jpg 1024w" sizes="(max-width: 461px) 100vw, 461px" /> <img decoding="async" class="alignnone wp-image-2223" src="https://mese.gr/wp-content/uploads/2023/10/DSC_0201-1-300x200.jpg" alt="" width="462" height="308" srcset="https://mese.gr/wp-content/uploads/2023/10/DSC_0201-1-300x200.jpg 300w, https://mese.gr/wp-content/uploads/2023/10/DSC_0201-1-1024x683.jpg 1024w" sizes="(max-width: 462px) 100vw, 462px" /></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/municipality-of-chania-the-first-of-the-five-electric-buses-has-been-delivered/">Municipality of Chania: The First of the Five Electric Buses has been Delivered</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MES ENERGY Undertook the Supply and Installation of Four Microgrid Photovoltaic Units at the Facilities of the Kilkis Municipal Enterprise for Water Supply and Sewerage</title>
		<link>https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-four-microgrid-photovoltaic-units-at-the-facilities-of-the-kilkis-municipal-enterprise-for-water-supply-and-sewerage/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Tue, 15 Aug 2023 12:01:17 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=2177</guid>

					<description><![CDATA[<p>MES ENERGY S.A. undertook the task of supplying and installing four Microgrid Photovoltaic Units at the facilities of the Kilkis Municipal Enterprise for Water Supply and Sewerage.The objective is to enhance their energy efficiency and lower operational costs. The €1,534,500 contract was signed on Thursday 10 August 2023 and is expected to be executed over...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-four-microgrid-photovoltaic-units-at-the-facilities-of-the-kilkis-municipal-enterprise-for-water-supply-and-sewerage/">MES ENERGY Undertook the Supply and Installation of Four Microgrid Photovoltaic Units at the Facilities of the Kilkis Municipal Enterprise for Water Supply and Sewerage</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. undertook the task of supplying and installing four Microgrid Photovoltaic Units at the facilities of the Kilkis Municipal Enterprise for Water Supply and Sewerage.The objective is to enhance their energy efficiency and lower operational costs. The €1,534,500 contract was signed on Thursday 10 August 2023 and is expected to be executed over the next fourteen months.</p>
<p>The company also assumed the testing, operation, and management of the equipment for one year, ensuring its optimal performance. Furthermore, MES ENERGY will provide training to the personnel of the Kilkis Municipal Water and Sewerage Company to ensure proper operation.</p>
<p>The project is funded by the Development and Solidarity Program for Local Government “Antonis Tritsis”, titled: &#8220;Key water supply projects to ensure sufficient water quantity and quality for human consumption&#8221;.</p>
<p>The installation of Photovoltaic Units represents a significant step toward a more sustainable future, enabling the utilization of solar radiation for electricity generation. This initiative will substantially reduce the Kilkis Municipal Water and Sewerage Company&#8217;s reliance on conventional energy sources and will contribute to overall environmental protection.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-four-microgrid-photovoltaic-units-at-the-facilities-of-the-kilkis-municipal-enterprise-for-water-supply-and-sewerage/">MES ENERGY Undertook the Supply and Installation of Four Microgrid Photovoltaic Units at the Facilities of the Kilkis Municipal Enterprise for Water Supply and Sewerage</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>P. Zervas: Hydrogen was, is, and will be the future</title>
		<link>https://mese.gr/en/p-zervas-hydrogen-was-is-and-will-be-the-future/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Mon, 31 Jul 2023 10:19:16 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1791</guid>

					<description><![CDATA[<p>At the Hydrogen &#38; Green Gases Forum organized by Energypress, Dr. Panagiotis Zervas, Director of Research and Development at MES ENERGY S.A., described the integration of hydrogen into the energy market and the transportation sector as an &#8216;inevitable path.&#8217; In his statement, following the conference, he noted: &#8220;It&#8217;s a great event. It is quite touching...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/p-zervas-hydrogen-was-is-and-will-be-the-future/">P. Zervas: Hydrogen was, is, and will be the future</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>At the Hydrogen &amp; Green Gases Forum organized by Energypress, Dr. Panagiotis Zervas, Director of Research and Development at MES ENERGY S.A., described the integration of hydrogen into the energy market and the transportation sector as an &#8216;inevitable path.&#8217;</p>
<p>In his statement, following the conference, he noted:</p>
<p>&#8220;It&#8217;s a great event. It is quite touching for those of us who have been involved in the hydrogen sector for at least 25 years, to see that all these people have gathered here and there is a significant investment interest. During our academic years, someone said that &#8216;hydrogen was, is, and will be the future.&#8217; Finally, the time has come, and it is here.</p>
<p>As a company, we take immense pride in being the ones who constructed the first Hydrogen Refuelling Station (HRS) in Greece, at the facilities of EKEFE Demokritos. Therefore, we are additionally delighted with the progress and the growing interest in this field.</p>
<p>According to the national hydrogen strategy&#8217;s plans and the willingness of the political leadership, we believe that moving towards the hydrogen sector and integrating it into transportation  is an unavoidable path. Hydrogen is not only beneficial for the environment but also contributes to the country&#8217;s energy security.</p>
<p>We hope to see more Hydrogen Refuelling Stations. The European target for our country is to have 26 by 2025. Although it presents challenges, having Hydrogen Refuelling Stations every 150-200 kilometers along the national roads is crucial. I believe it is a one-way road, and we will witness it.&#8221;</p>
<p><iframe title="Παναγιώτης Ζέρβας - Δήλωση" width="640" height="360" src="https://www.youtube.com/embed/SLGUX_ujX6g?start=1&#038;feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/p-zervas-hydrogen-was-is-and-will-be-the-future/">P. Zervas: Hydrogen was, is, and will be the future</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MES ENERGY S.A. Undertook the Supply and Installation of 114 LED Lighting Fixtures with PV Panel, Battery and Pole</title>
		<link>https://mese.gr/en/__trashed/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Mon, 10 Jul 2023 14:37:23 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1964</guid>

					<description><![CDATA[<p>MES ENERGY S.A. undertook, on behalf of the Municipality of Ios, the supply, installation, and commissioning of 114 LED lighting fixtures. These autonomous fixtures are powered by batteries that are charged using a PV panel placed on their pole. The contract, worth 578,493 euros, was signed on Monday, July 3, 2023, and is expected to...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/__trashed/">MES ENERGY S.A. Undertook the Supply and Installation of 114 LED Lighting Fixtures with PV Panel, Battery and Pole</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. undertook, on behalf of the Municipality of Ios, the supply, installation, and commissioning of 114 LED lighting fixtures. These autonomous fixtures are powered by batteries that are charged using a PV panel placed on their pole. The contract, worth 578,493 euros, was signed on Monday, July 3, 2023, and is expected to be completed within six months.</p>
<p>The LED luminaires will be installed at critical points along the municipal road network, where visibility is low and driving conditions are challenging. Additionally, they will be placed on narrow roads, particularly in the port area, where there is high pedestrian and vehicle traffic without the presence of sidewalks. By strategically locating the LED luminaires, the Municipality aims to enhance safety and visibility for pedestrians and vehicles.</p>
<p>The LED lighting fixtures not only provide better visibility but also withstand adverse weather conditions and offer the best possible quality and aesthetic results. Additionally, by adopting lighting technologies that minimize energy consumption, the environment is protected, and sustainable development is promoted.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/__trashed/">MES ENERGY S.A. Undertook the Supply and Installation of 114 LED Lighting Fixtures with PV Panel, Battery and Pole</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MES ENERGY Undertook the Supply and Installation of PV Systems with Net-Metering Mechanism and New LED Lighting Fixtures in Eight Buildings of the Municipality of Heraklion</title>
		<link>https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-pv-systems-with-net-metering-mechanism-and-new-led-lighting-fixtures-in-eight-buildings-of-the-municipality-of-heraklion/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Fri, 30 Jun 2023 10:23:50 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1950</guid>

					<description><![CDATA[<p>MES ENERGY S.A. undertook, on behalf of the Municipality of Heraklion, the supply and installation of eight PV Systems with a total capacity of 151.19 kWp. These systems will operate using the Net-Metering mechanism. Additionally, the company will replace the existing conventional lamps in eight municipal buildings with new energy-efficient LED lighting fixtures. The contract,...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-pv-systems-with-net-metering-mechanism-and-new-led-lighting-fixtures-in-eight-buildings-of-the-municipality-of-heraklion/">MES ENERGY Undertook the Supply and Installation of PV Systems with Net-Metering Mechanism and New LED Lighting Fixtures in Eight Buildings of the Municipality of Heraklion</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. undertook, on behalf of the Municipality of Heraklion, the supply and installation of eight PV Systems with a total capacity of 151.19 kWp. These systems will operate using the Net-Metering mechanism. Additionally, the company will replace the existing conventional lamps in eight municipal buildings with new energy-efficient LED lighting fixtures. The contract, worth 312,006 euros, was signed on Monday, June 19, 2023, and is expected to be completed within eighteen months.</p>
<p>Net-Metering enables Local Government Organizations to offset a significant portion of their electricity consumption by harnessing solar energy from the PV panels to meet their energy demands. At the same time, LED lamps achieve significant energy savings compared to traditional ones as they have up to ten times longer lifespan, are more durable, do not emit heat, do not contain harmful gases like mercury, consume less electricity, and have minimal maintenance requirements.</p>
<p>Due to its high energy consumption, the Municipality of Heraklion is compelled to prioritize energy-saving measures through the adoption of Renewable Energy Sources. These initiatives are expected to significantly enhance the Municipality&#8217;s energy profile and drastically reduce CO<sub>2</sub> emissions.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-pv-systems-with-net-metering-mechanism-and-new-led-lighting-fixtures-in-eight-buildings-of-the-municipality-of-heraklion/">MES ENERGY Undertook the Supply and Installation of PV Systems with Net-Metering Mechanism and New LED Lighting Fixtures in Eight Buildings of the Municipality of Heraklion</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MES ENERGY Undertook the Supply of Two Electric Buses and One Electric Vehicle Charging Station for the Municipality of Agioi Anargyroi &#8211; Kamatero</title>
		<link>https://mese.gr/en/mes-energy-undertook-the-supply-of-two-electric-buses-and-one-electric-vehicle-charging-station-for-the-municipality-of-agioi-anargyroi-kamatero/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Tue, 30 May 2023 09:35:30 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1924</guid>

					<description><![CDATA[<p>MES ENERGY S.A. undertook the supply of two &#8220;urban type&#8221; electric buses and one electric vehicle charging station to meet the transportation needs of the Municipality of Agioi Anargyroi- Kamatero. The contract, worth 1,361,500 euros, was signed on Tuesday, May 23, 2023, and is expected to be completed over the next twelve months. The project...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-undertook-the-supply-of-two-electric-buses-and-one-electric-vehicle-charging-station-for-the-municipality-of-agioi-anargyroi-kamatero/">MES ENERGY Undertook the Supply of Two Electric Buses and One Electric Vehicle Charging Station for the Municipality of Agioi Anargyroi &#8211; Kamatero</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. undertook the supply of two &#8220;urban type&#8221; electric buses and one electric vehicle charging station to meet the transportation needs of the Municipality of Agioi Anargyroi- Kamatero. The contract, worth 1,361,500 euros, was signed on Tuesday, May 23, 2023, and is expected to be completed over the next twelve months.</p>
<p>The project is funded by the Development and Solidarity Program for Local Government &#8220;Antonis Tritsis&#8221; under the priority axis &#8220;Environment&#8221; titled: &#8220;Electromobility Actions in Municipalities.&#8221;</p>
<p>Electric buses have significant advantages compared to conventional ones with internal combustion engines, as they produce zero CO<sub>2</sub> emissions and other harmful gases that negatively affect human health and the environment. They also require minimal maintenance and show a significant reduction in noise emissions.</p>
<p>The Municipality of Agioi Anargyroi &#8211; Kamatero is a pioneer in the field of sustainable mobility and environmental protection with its decision to choose electric buses for public transportation, while setting a good example to other local authorities and encouraging the wider adoption of green transportation.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-undertook-the-supply-of-two-electric-buses-and-one-electric-vehicle-charging-station-for-the-municipality-of-agioi-anargyroi-kamatero/">MES ENERGY Undertook the Supply of Two Electric Buses and One Electric Vehicle Charging Station for the Municipality of Agioi Anargyroi &#8211; Kamatero</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MES ENERGY Undertook the Supply and Installation of an Integrated Leakage Detection System and a Central Telemetry System for the Water Supply Network in the Municipality of Delphi</title>
		<link>https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-an-integrated-leakage-detection-system-and-a-central-telemetry-system-for-the-water-supply-network-in-the-municipality-of-delphi/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Mon, 30 Jan 2023 13:50:30 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1939</guid>

					<description><![CDATA[<p>MES ENERGY S.A. undertook, on behalf of Delphi Municipal Enterprise for Water Supply and Sewerage, the design, procurement, and installation of an integrated leakage control system and a central telemetry system for the water supply network. The contract, worth 1,180,324 euros, was signed on Friday, January 27, 2023, and is expected to be completed within...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-an-integrated-leakage-detection-system-and-a-central-telemetry-system-for-the-water-supply-network-in-the-municipality-of-delphi/">MES ENERGY Undertook the Supply and Installation of an Integrated Leakage Detection System and a Central Telemetry System for the Water Supply Network in the Municipality of Delphi</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. undertook, on behalf of Delphi Municipal Enterprise for Water Supply and Sewerage, the design, procurement, and installation of an integrated leakage control system and a central telemetry system for the water supply network. The contract, worth 1,180,324 euros, was signed on Friday, January 27, 2023, and is expected to be completed within fifteen months.</p>
<p>Specifically, a central control system will be created, enabling the comprehensive management of water resources through electronic monitoring of the water transport/distribution network. Based on the information collected from all water supply facilities, it will offer the following capabilities:</p>
<ul>
<li>Detection of possible leaks (both visible and invisible)</li>
<li>Immediate availability of human resources and equipment for coordinating repairs and addressing damages</li>
<li>Quantitative calculation of water reserves</li>
<li>Real-time water balance values</li>
<li>Actual water consumption measurement</li>
</ul>
<p>The project is funded by the Development and Solidarity Program for Local Government “Antonis Tritsis” under the priority axis “Environment” titled: &#8220;Water Supply Infrastructure.&#8221;</p>
<p>MES ENERGY S.A. will provide training to the staff responsible for managing the system, ensuring its proper operation and maintenance  and offer a twelve-month warranty to guarantee the system&#8217;s safety and reliability.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-undertook-the-supply-and-installation-of-an-integrated-leakage-detection-system-and-a-central-telemetry-system-for-the-water-supply-network-in-the-municipality-of-delphi/">MES ENERGY Undertook the Supply and Installation of an Integrated Leakage Detection System and a Central Telemetry System for the Water Supply Network in the Municipality of Delphi</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MES Energy S.A. Undertook the Supply of Electric Vehicles for the Municipality of Chania</title>
		<link>https://mese.gr/en/mes-energy-s-a-undertook-the-supply-of-electric-vehicles-for-the-municipality-of-chania/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Wed, 23 Nov 2022 07:56:46 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1663</guid>

					<description><![CDATA[<p>The supply of five new electric buses, a cleaning vehicle and two fast-charging stations was undertaken by MES ENERGY S.A. on behalf of the Municipality of Chania. The contract was signed on Friday 18 November 2022 and it is expected to be completed during the following twelve months. The electric buses are going to be...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-s-a-undertook-the-supply-of-electric-vehicles-for-the-municipality-of-chania/">MES Energy S.A. Undertook the Supply of Electric Vehicles for the Municipality of Chania</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The supply of five new electric buses, a cleaning vehicle and two fast-charging stations was undertaken by MES ENERGY S.A. on behalf of the Municipality of Chania. The contract was signed on Friday 18 November 2022 and it is expected to be completed during the following twelve months.</p>
<div>
<div>The electric buses are going to be used for the interconnection between the city center and parking spaces in order to significantly reduce traffic congestion.</div>
<div></div>
<div>The entire project is financed by the Ministry of Interior as a part of &#8220;Antonis Tritsis&#8221; program, which aims to upgrade municipal infrastructures considering sustainable development.</div>
<div></div>
<div>Representing MES ENERGY S.A. CEO of the company Kostis Terzis was attended the signing of the contract in Chania, where he made the following statements: &#8220;Chania will be a pioneer in electromobility field, as it is provided by the largest fleet in Greece and it seems to be the first city that will put them in operation.</div>
<div></div>
<div>Furthermore the Mayor of Chania Panagiotis Simandirakis said: &#8220;This is a part of a huge effort which concerns the energy saving policy, the need to have public transportations,which are environmentally friendly and also the improvement of the traffic congestion problem. During the signing of the contract was also present the Director of Research and development of the company Dr. Panagiotis Zervas as well as representatives of TAM-EUROPE, Bryan Zhao and Pedro Cardenas.</div>
<div>MES ENERGY S.A. has the technical know-how and the reliability in the field of electromobility and with this contract continues its course in sustainable development projects.</div>
</div>
<p>The post <a rel="nofollow" href="https://mese.gr/en/mes-energy-s-a-undertook-the-supply-of-electric-vehicles-for-the-municipality-of-chania/">MES Energy S.A. Undertook the Supply of Electric Vehicles for the Municipality of Chania</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Participation in the European Hydrogen Week 2022</title>
		<link>https://mese.gr/en/participation-in-the-european-hydrogen-week-2022/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Tue, 08 Nov 2022 13:03:26 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1652</guid>

					<description><![CDATA[<p>In the time between 24th and 28th of October 2022 the 3rd European Hydrogen Week took place in the city of Brussels, organized by HYDROGEN EUROPE. Speeches, discussions and a tectological exhibition, with the latest developments in the field of hydrogen, were held in during the event. Exhibitors from around the world have presented innovations,...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-european-hydrogen-week-2022/">Participation in the European Hydrogen Week 2022</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In the time between 24<sup>th</sup> and 28<sup>th</sup> of October 2022 the 3<sup>rd</sup> European Hydrogen Week took place in the city of Brussels, organized by HYDROGEN EUROPE. Speeches, discussions and a tectological exhibition, with the latest developments in the field of hydrogen, were held in during the event. Exhibitors from around the world have presented innovations, which pave the way to an expanded presence of hydrogen in the future of green growth. At the same time, Eurocrats underlined the urgent need to limit the Europe’s dependence from the hydrocarbons and replace them with hydrogen, as the main fuel, in the framework of REPOWER EU plan. There has also been a commitment for the creation of financial incentives in order to enforce investments in hydrogen market. MES ENERGY S.A. executives participated once more in the EHW, highlighting the company’s active role in the field. MES ENERGY S.A. is a pioneer in this field in Greece, having installed and commissioned the 1st Hydrogen refuelling station in the country, as well as hydrogen-powered vehicles with Hydrogen fuel cells and now is aiming for its further expansion in this specific market.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-european-hydrogen-week-2022/">Participation in the European Hydrogen Week 2022</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Esco Partners Invests € 20 m. in Portfolio of Rooftop Solar Panels and Cogeneration Units</title>
		<link>https://mese.gr/en/esco-partners-invests-e20m-in-portfolio-of-rooftop-solar-panels-and-cogeneration-units/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Wed, 01 Jun 2022 10:24:01 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1607</guid>

					<description><![CDATA[<p>The private equity firm, SIREC ENERGY CAPITAL PARTNERS S.A, who invests in environmental sustainability projects, and MES ENERGY S.A, a subsidiary of Mesogios Group, who has expertise in energy saving solutions (ESS) and renewable energy sources (RES), have jointly established ESCO PARTNERS S.A., in order to develop rooftop PV systems using net metering for industrial...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/esco-partners-invests-e20m-in-portfolio-of-rooftop-solar-panels-and-cogeneration-units/">Esco Partners Invests € 20 m. in Portfolio of Rooftop Solar Panels and Cogeneration Units</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The private equity firm, SIREC ENERGY CAPITAL PARTNERS S.A, who invests in environmental sustainability projects, and MES ENERGY S.A, a subsidiary of Mesogios Group, who has expertise in energy saving solutions (ESS) and renewable energy sources (RES), have jointly established <strong>ESCO PARTNERS S.A.</strong>, in order to develop rooftop PV systems using net metering for industrial and commercial applications for immediate energy consumption and zero transmission waste. In addition, ESCO PARTNERS S.A. is set to develop alternative systems for the cogeneration of electricity and power (Cogeneration of Heat and Power, or CHP) for industrials. In the CHP systems the fuel consumed generates additional energy in the form of water or steam plus electricity which is redistributed through the power grids or kept in the local facility through net metering. The activities of ESCO PARTNERS S.A. are fully aligned with the recent announcement of European Commission,<strong> REPowerEU</strong> which further promotes Renewable Energy in an effort for the EU to become independent form Russian import of fossil fuels.</p>
<p>The usage of <strong>Net Metering</strong>, as stipulated by Greek and European regulatory frameworks, ensures that the energy produced through CHP systems/RES covers the requirements of local facilities first, with excess supply then going to wider energy grids for future consumption. The user offsets the energy produced and consumed with the energy provider. In this way energy optimisation is achieved through CHP systems and renewable energy sources developed by ESCO PARTNERS.</p>
<p><strong>ESCO PARTNERS S.A.</strong> is currently in discussions with large organisations to develop these systems for industrial and commercial spaces, warehouses, and big box retailer areas. The company is providing end-to-end solutions that include design, licencing, procurement and installation of the systems in less than twelve months. In addition, the company undertakes the maintenance and service of the systems throughout the full operating time.</p>
<p>Moreover, <strong>ESCO PARTNERS S.A.</strong> will develop such systems at no extra cost to the customer. For this reason, the company has secured €20m to cover the financing of the investments whilst generating revenue from energy sales. The strategic plan includes development and generation of 30 megawatts (MW) over the next three years.</p>
<p>High energy prices and the need for clean energy solutions make CHP and Photovoltaic panel systems an excellent choice. Rooftop PV systems in particular have two major advantages: a) do not require additional land allocation b) energy can be generated where it is consumed, avoiding energy wastage during transit, leading to major financial benefits.</p>
<p><strong>The Managing Director of MES, Kostis Terzis commented:</strong><br />
ESCO PARNTERS S.A. secures the capital for the development of innovative sustainable energy projects that are critical to the generation of cost-effective green energy.</p>
<p><strong>The Chairman of SECP, Dionissis Alissandratos commented:</strong><br />
The private equity capital provides us with the flexibility and agility to support the development of innovative and environmentally friendly projects and provide solutions for major environmental issues, like the production of low-cost energy that will in turn generate<br />
higher yields to long term investors.</p>
<p><strong>About MES ENERGY S.A:</strong><br />
<strong>MES ENERGY S.A</strong> is a subsidiary of <strong>Mesogios Group</strong>, who have expertise in the development and construction of renewable energy sources and efficiency systems. The company has managed over 500 MW of green energy systems over the last years whilst managing projects totalling 35 MW. Construction in renewable energy and efficiency projects exceeds 30 MW.</p>
<p><strong>About SIREC ENERGY CAPITAL PARTNERS:</strong><br />
<strong>SIREC ENERGY CAPITAL PARTNERS</strong> is an independent Private Equity Firm, managing the <strong>European Sustainable Investment Fund (EUSIF)</strong> with € 50 m. assets under management and a focus on investing in environmental sustainability and energy efficiency projects. EUSIF was established in 2021, but the team has a track record of more than € 400 m. of executed investments in projects in energy efficiency and renewable energy production across seven European countries.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/esco-partners-invests-e20m-in-portfolio-of-rooftop-solar-panels-and-cogeneration-units/">Esco Partners Invests € 20 m. in Portfolio of Rooftop Solar Panels and Cogeneration Units</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Collaboration with ENEFIIN Holdings Company</title>
		<link>https://mese.gr/en/collaboration-with-enefiin-holdings-company/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Wed, 25 May 2022 16:21:40 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1595</guid>

					<description><![CDATA[<p>We are happy to announce that MES ENERGY S.A. has joined forces with ENEFIIN holdings company, in order to promote hydrogen technologies. MES ENERGY S.A. presents pioneer hydrogen projects, contributing to the beginning of a new era of green transportations worldwide. This collaboration is founded on the common goal of the two companies to expand...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/collaboration-with-enefiin-holdings-company/">Collaboration with ENEFIIN Holdings Company</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">We are happy to announce that MES ENERGY S.A. has joined forces with ENEFIIN holdings company, in order to promote hydrogen technologies. MES ENERGY S.A. presents pioneer hydrogen projects, contributing to the beginning of a new era of green transportations worldwide. This collaboration is founded on the common goal of the two companies to expand the hydrogen economy and, therefore, reduce the carbon footprint on our planet.</span></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/collaboration-with-enefiin-holdings-company/">Collaboration with ENEFIIN Holdings Company</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>SEAK Tools Uploaded on the ΗΜΕΕ Website with the Support of MES ENERGY S.A.</title>
		<link>https://mese.gr/en/seak-tools-uploaded-on-the-%ce%b7%ce%bc%ce%b5%ce%b5-website-with-the-support-of-mes-energy-s-a/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Tue, 17 May 2022 15:10:56 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1588</guid>

					<description><![CDATA[<p>MES ENERGY S.A. undertook the provision of services  for the investigation and categorization of buildings in the Municipality of Heraklion, Crete in the framework of the project “Integrated Management Support for Energy efficiency in Mediterranean PUblic buiLdings-IMPULSE” (1MED15_2.1_M2_178), which has been included in the European Cooperation Programme for the Mediterranean area “INTERREG MED” 2014-2020. The...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/seak-tools-uploaded-on-the-%ce%b7%ce%bc%ce%b5%ce%b5-website-with-the-support-of-mes-energy-s-a/">SEAK Tools Uploaded on the ΗΜΕΕ Website with the Support of MES ENERGY S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">MES ENERGY S.A. undertook the provision of services  for the investigation and categorization of buildings in the Municipality of Heraklion, Crete in the framework of the project “Integrated Management Support for Energy efficiency in Mediterranean PUblic buiLdings-IMPULSE” (1MED15_2.1_M2_178), which has been included in the European Cooperation Programme for the Mediterranean area “INTERREG MED” 2014-2020. The company undertook the technical and scientific support of the Municipality, delivering a technical report for the evaluation of energy upgrade measures in public buildings, under the coordination of the Centre for Renewable Sources and Energy Saving (CRES). In the aforementioned project, MES Energy S.A. successfully used the developed excel-based tools for the implementation of the plan for the gradual energy upgrade of public buildings in the Municipality of Heraklion, which is a partner of the IMPULSE project.</span></p>
<p><span style="font-weight: 400;">MES ENERGY S.A. supports CRES in the capitalisation of the special tools for the implementation of Action Plans for public buildings that have been developed in the framework of the European Program “Efficient Buildings Interreg MED 2014-2020”. In the support of CRES, the company coordinated a specialised meeting with competent representatives of the Hellenic Ministry of Energy and Environment (HMEE) and prepared the necessary documentation for good use of the tools, with demonstration of results by the mentioned support service in the Municipality of Heraklion. A result of the capitalisation support services is the fact that, for the first time, tools of the Interreg MED projects (e.g. IMPULSE and SISMA) were uploaded in the supporting tools for the realisation of Plans for the Energy Efficiency of buildings (reffered to as </span><span style="font-weight: 400;">SEAK) </span><span style="font-weight: 400;">on the website of the HMEE. </span></p>
<p><span style="font-weight: 400;">The outcome of this effort was the substantial capitalization of the results of research projects, through the technical analysis and processing of energy performances, indicators etc. MES ENERGY S.A. continues to utilise and evolve the methods and tools used for planning energy policies and strategies. In combination with other relevant projects, the company has achieved a leading role in the planning of energy strategies of Public Bodies and Local Government Organisations</span></p>
<p><span style="font-weight: 400;">The aforementioned tools were uploaded on the following link, as supporting tools for the realisation of SEAK, in the framework of law 4843/2021:</span></p>
<p><span style="font-weight: 400;">https://ypen.gov.gr/energeia/energeiaki-exoikonomisi/ktiria/schedio-energeiakis-apodosis-ktirion-perifereion-kai-dimon/</span></p>
<p>&nbsp;</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/seak-tools-uploaded-on-the-%ce%b7%ce%bc%ce%b5%ce%b5-website-with-the-support-of-mes-energy-s-a/">SEAK Tools Uploaded on the ΗΜΕΕ Website with the Support of MES ENERGY S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Participation in the Exhibition Intersolar Europe 2022</title>
		<link>https://mese.gr/en/participation-in-the-exhibition-intersolar-europe-2022/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Mon, 16 May 2022 09:43:19 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1601</guid>

					<description><![CDATA[<p>MES ENERGY S.A. executives participated again in the exhibition Intersolar Europe, which took place on May 11-13 2022, at the Messe München exhibition centre in Munich, Germany. In the exhibition, which constitutes the largest platform for the solar energy industry, 1,356 exhibitors from 46 countries participated, while more than 65,000 visitors from 149 countries attended....</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-exhibition-intersolar-europe-2022/">Participation in the Exhibition Intersolar Europe 2022</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. executives participated again in the exhibition Intersolar Europe, which took place on May 11-13 2022, at the Messe München exhibition centre in Munich, Germany. In the exhibition, which constitutes the largest platform for the solar energy industry, 1,356 exhibitors from 46 countries participated, while more than 65,000 visitors from 149 countries attended.</p>
<p>In the Intersolar Europe exhibition, many pioneering solutions were presented to achieve a sustainable and secure energy supply, aimed at mitigating climate change. Modern industry trends were discussed, such as the combination of PV with storage systems, charging of electric cars, agricultural PV, as well as floating PV.</p>
<p>All participants share the common goal for decarbonisation of the energy sector and for achieving energy supply entirely from renewable sources. The aforementioned exhibition provided the opportunity for discussions and exchange of pioneering ideas that will provide immediate and necessary solutions to reduce the impact of energy production on the planet.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-exhibition-intersolar-europe-2022/">Participation in the Exhibition Intersolar Europe 2022</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Participation in the 4th International Exposition Verde.tec &#8211; Environmental Technologies</title>
		<link>https://mese.gr/en/participation-in-the-4th-international-exposition-verde-tec-environmental-technologies/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Mon, 21 Mar 2022 15:33:03 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1577</guid>

					<description><![CDATA[<p>MES ENERGY S.A. &#8211; member of MESOGEOS S.A. group &#8211; participated in the 4th International Exposition “Verde.tec &#8211; Environmental Technologies”, which took place on March 18-20. The exhibition is an opportunity to promote the innovations in green technologies, in which participated companies from the fields of Environmental Rehabilitation, Energy Saving, Renewable Energy Sources, Product and...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-4th-international-exposition-verde-tec-environmental-technologies/">Participation in the 4th International Exposition Verde.tec &#8211; Environmental Technologies</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. &#8211; member of MESOGEOS S.A. group &#8211; participated in the 4th International Exposition “Verde.tec &#8211; Environmental Technologies”, which took place on March 18-20. The exhibition is an opportunity to promote the innovations in green technologies, in which participated companies from the fields of Environmental Rehabilitation, Energy Saving, Renewable Energy Sources, Product and Material Recycling, Resources Management, Liquid and Solid Waste Management, “Green” Industry, as well as Electromobility.</p>
<p>In the exhibition, MES ENERGY S.A. presented, among other things, the first commercially available hydrogen-fueled bikes (H2 BIKE), developed to meet today’s needs for ecological transportation. The bikes have an excellent autonomy of 145 km with a single refueling, thanks to their combination of an integrated hydrogen tank with a high-efficiency fuel cell. Some additional features of the bikes are the energy performance of 780 Wh, the hydrogen tank with a pressure of 300 bar, the assisted speed reaching 25 km/h, the minimum carbon footprint of 0.2 g/km, as well as the wide operating temperature range, so that neither heat nor cold affect the bikes’ performance. Finally, the bikes also present the possibility of instant refueling, as, compared to conventional electric bikes, they are refueled with hydrogen in less than 60 seconds, in any hydrogen refueling station. It is worth noting that MES ENERGY S.A. designed, supplied and installed the first Hydrogen Refueling Station in Greece, which is located at the premises of Demokritos in Agia Paraskevi, Attica.</p>
<p>Apart from the hydrogen bikes, the company presented, in the exhibition, its participation in the development of an Integrated Prototype Multivariable Automatic Control System for the Energy Saving in Wastewater Treatment Plants (WWTP). This innovative System addressed the operation of WWTP in dynamic environments by integrating the Model Predictive Control (MPC) method in wastewater treatment. The integrated algorithm of the System takes into account the main cost factors of the WWTP, such as ventilation, pump operation or aerobic digestion, in order to define the optimal actions for the time period defined each time. Some advantages resulting from the use of the mentioned Automatic Control System are the lower operating costs of the WWTP, the minimisation of the energy consumption and of the COD/BOD fluctuations, as well as the possibility for the user to incorporate a schedule and limitations in critical factors.</p>
<p><img decoding="async" class="size-medium wp-image-1575 alignleft" src="https://mese.gr/wp-content/uploads/2022/03/h2bike6-300x228.jpg" alt="" width="300" height="228" srcset="https://mese.gr/wp-content/uploads/2022/03/h2bike6-300x228.jpg 300w, https://mese.gr/wp-content/uploads/2022/03/h2bike6-1024x778.jpg 1024w, https://mese.gr/wp-content/uploads/2022/03/h2bike6.jpg 1244w" sizes="(max-width: 300px) 100vw, 300px" /><img decoding="async" class="wp-image-1573 alignleft" src="https://mese.gr/wp-content/uploads/2022/03/h2bike5-300x225.jpg" alt="" width="304" height="228" srcset="https://mese.gr/wp-content/uploads/2022/03/h2bike5-300x225.jpg 300w, https://mese.gr/wp-content/uploads/2022/03/h2bike5-1024x768.jpg 1024w, https://mese.gr/wp-content/uploads/2022/03/h2bike5.jpg 1600w" sizes="(max-width: 304px) 100vw, 304px" /></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-4th-international-exposition-verde-tec-environmental-technologies/">Participation in the 4th International Exposition Verde.tec &#8211; Environmental Technologies</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Coordination and Management of the Installation of LED Lighting in the Road Network of the Attica Region</title>
		<link>https://mese.gr/en/coordination-and-management-of-the-installation-of-led-lighting-in-the-road-network-of-the-attica-region/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Fri, 24 Dec 2021 17:29:40 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1518</guid>

					<description><![CDATA[<p>MESOGEOS S.A. undertook, in consortium with AKTOR FM S.A. and GLOBITEL S.A., the “Maintenance and upgrade of the street lighting in the main roads of the Attica Region in order to save energy and reduce operating costs”. The relevant tender was conducted through an Open Process of the National System of Electronic Public Procurement (ESIDIS),...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/coordination-and-management-of-the-installation-of-led-lighting-in-the-road-network-of-the-attica-region/">Coordination and Management of the Installation of LED Lighting in the Road Network of the Attica Region</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MESOGEOS S.A. undertook, in consortium with AKTOR FM S.A. and GLOBITEL S.A., the “Maintenance and upgrade of the street lighting in the main roads of the Attica Region in order to save energy and reduce operating costs”. The relevant tender was conducted through an Open Process of the National System of Electronic Public Procurement (ESIDIS), by the Region of Attica, by the Directorate of Project Development Planning and the Directorate of Metropolitan Infrastructure Management. The value of the relevant contract, signed on April 20, 2021, amounts to € 37,000,000 and is financed by the Operational Program &#8220;Attiki 2014-2020&#8221; (NSRF 2014-2020). MES ENERGY S.A., as a subsidiary of MESOGEOS S.A. with extensive experience in energy saving applications such as LED lighting, has undertaken the Project Management and Asset Management of the project for 10 years.</p>
<p>The object of this contract is, first of all, the collection of data and the recording of the existing street lighting information, as well as the design and mapping of the specifications of the new street lighting system and the conduction of the necessary phototechnical study. This is followed by the supply and installation of 23,790 pieces of LED technology luminaires with a power of 150W to 1000W, which will replace the existing energy-intensive luminaires using Sodium lamps. It is worth mentioning that the existing luminaires require an annual light bulb replacement, whereas the new LED luminaires operate seamlessly for 10,000 hours, i.e. for over 20 years, thus reducing the maintenance requirements. The new luminaires are equipped with a wireless controller in order to be able to fully integrate into an IOT (internet Of Things) Management System. In addition, the supply, installation, configuration and commissioning of an IOT street lightning Management System will be realised, in order to achieve the management and control of the street lightning of the main roads of the Attica Region. The remote management system consists of the devices and procedures used by the end user to receive information related to the operation of the street lighting, as well as to give instructions concerning the configuration of its operating profile. For example, through the management system, the illumination level of the luminaires, their connection to motion sensors etc can be controlled. The three mentioned companies will also be responsible for the provision of operation and maintenance services for the lighting system for 10 years.</p>
<p>Through the above interventions, an annual saving of street lighting electricity cost of at least 65% is expected in the Attica Region, corresponding to 1.5 million € per year in favor of the citizens. An additional advantage that arises, apart from the energy saving and the improvement of the footprint of the Attica Region on the environment, is the improvement of lighting quality and visibility, which will improve road safety in the main streets of the Region. The advantages however, do not stop here, as the luminaires are fully controlled via a remote control system, which means that it is possible to receive data concerning their situation in real time, and therefore potential damage can be treated faster.</p>
<p>The upgrade of the lighting bodies began on December 6, 2021, on Poseidonos and Kifisias Avenues, and the better lighting quality is already evident. Similar works will follow in the most important avenues of Attica, such as Kifisou, Siggrou, Marathonos, Vouliagmenis, Alimou and Katechaki, as well as in the streets around the centre of Athens, such as Panepistimiou, Amalias, Vasilissis Sofias and Pireos.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/coordination-and-management-of-the-installation-of-led-lighting-in-the-road-network-of-the-attica-region/">Coordination and Management of the Installation of LED Lighting in the Road Network of the Attica Region</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Participation in the Company Smart Agro Hub S.A.</title>
		<link>https://mese.gr/en/participation-in-the-company-smart-agro-hub-s-a/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Wed, 22 Dec 2021 17:51:31 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1510</guid>

					<description><![CDATA[<p>MES ENERGY S.A. signed its participation in the share capital of the recently established company Smart Agro Hub S.A., in collaboration with the Agricultural University of Athens, as well as with other renowned companies specialised in the primary sector and in state-of-the-art technologies. MES ENERGY S.A. also participates, through its representative, in the Board of...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-company-smart-agro-hub-s-a/">Participation in the Company Smart Agro Hub S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. signed its participation in the share capital of the recently established company Smart Agro Hub S.A., in collaboration with the Agricultural University of Athens, as well as with other renowned companies specialised in the primary sector and in state-of-the-art technologies. MES ENERGY S.A. also participates, through its representative, in the Board of directors of the company.</p>
<p>Smart Agro Hub S.A. partners companies, including MES ENERGY S.A., which jointly submitted a proposal, later approved, to the program “COMPETENCE CENTRES” of the Operational Program “Competitiveness Entrepreneurship and Innovation 2014-2020” of the General Secretariat of Research and Innovation (GSRI). For the new company, which was included in the act “Centre of competence, specialisation and innovation in intelligent agriculture and new technologies”, funding exceeding 1.000.000 € was achieved, while the act was co-funded by the European Regional Development Fund (ERDF). The purpose of this new body focuses on the creation of a Competence Centre in the field of new technologies in the agricultural sector. In addition, the company will operate as a space for testing, evaluating and improving relevant technologies of companies of the agri-food sector and of companies related to smart technologies (Living Lab). The company will also undertake the development of products and technologies concerning smart technologies in the agricultural sector, as well as the development and maintenance of a highly qualified staff, through appropriate training and expertise. At the same time, the company will be responsible for the provision of consulting, guidance and training to other companies specialised in the primary sector, while it will also act as a point of contact and representation of companies in meetings between private and public bodies at national and international level.</p>
<p>Smart Agro Hub S.A. seeks to lead the way in the field of intelligent agriculture and new technologies. The creation of the company is an important project in Greece, as it constitutes the first partnership of a University with private companies for the creation of a Competence Centre. Through its participation in the aforementioned partnership, MES ENERGY S.A. expands its activity in the use of new energy technologies and applications in the agricultural sector.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-company-smart-agro-hub-s-a/">Participation in the Company Smart Agro Hub S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Production Permits for 9 Energy Storage Stations using Accumulators</title>
		<link>https://mese.gr/en/production-permits-for-9-energy-storage-stations-using-accumulators/</link>
		
		<dc:creator><![CDATA[mesenergy]]></dc:creator>
		<pubDate>Mon, 13 Dec 2021 15:32:33 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1501</guid>

					<description><![CDATA[<p>On November 4, 2021, MES ENERGY S.A. received permits for 8 energy storage projects using accumulators, with a total power of 338 MW. The first permit concerns the installation of batteries of 150 MW total power, divided into 3 projects of 50 MW each. The 3 projects will be constructed in the region of Achaea,...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/production-permits-for-9-energy-storage-stations-using-accumulators/">Production Permits for 9 Energy Storage Stations using Accumulators</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">On November 4, 2021, MES ENERGY S.A. received permits for 8 energy storage projects using accumulators, with a total power of 338 MW. The first permit concerns the installation of batteries of 150 MW total power, divided into 3 projects of 50 MW each. The 3 projects will be constructed in the region of Achaea, in the region of Kozani and in the region of Phocis respectively. The second permit obtained by the company is related to the production of energy storage stations of 18 MW total power, divided into 3 projects of 6 MW each. The referred projects will be developed in the region of Pyrgos, in the region of Evia and in the region of Achaea. On the same day, the company received permits for 2 additional energy storage projects, which will be installed in the Regional Unit of Kozani. The first project will have a power of 20 MW, while the second will have a power of 150 MW. Finally, on November 25 2021, the company received a production permit for an additional project, which will be constructed in the region of Phokis, with a power of 6 MW. The relevant applications for the licensing of the projects were submitted to RAE in June, 2021.</span></p>
<p><span style="font-weight: 400;">In total, MES ENERGY S.A. presents a portfolio including 9 energy storage projects with a total power of 344 MW. By obtaining the above permits, the company entered the field of energy storage, which is of growing interest at the moment. </span></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/production-permits-for-9-energy-storage-stations-using-accumulators/">Production Permits for 9 Energy Storage Stations using Accumulators</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Participation in the Exhibition and Conference Intersolar Europe</title>
		<link>https://mese.gr/en/participation-in-the-exhibition-and-conference-intersolar-europe/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Tue, 12 Oct 2021 13:48:13 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=905</guid>

					<description><![CDATA[<p>&#160; On October 6-8 2021, the annual exhibition and conference Intersolar Europe took place at the Messe München exhibition center in Munich, Germany. Both the exhibition and the conference focus on three areas of solar technology in specific, on photovoltaics, solar thermal and solar power plants. At Intersolar, information on each stage of the preparation...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-exhibition-and-conference-intersolar-europe/">Participation in the Exhibition and Conference Intersolar Europe</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>&nbsp;</p>
<p>On October 6-8 2021, the annual exhibition and conference Intersolar Europe took place at the Messe München exhibition center in Munich, Germany. Both the exhibition and the conference focus on three areas of solar technology in specific, on photovoltaics, solar thermal and solar power plants. At Intersolar, information on each stage of the preparation of projects of the aforementioned areas was provided, from their design and development to their commissioning and monitoring.</p>
<p>MES ENERGY S.A. executives participated in the conference, due to the company’s significant presence in the field of solar technology. The company undertakes the study, development, construction, operation, maintenance and management of photovoltaic projects, as well as the provision of consulting services in the above stages. The company is also involved in the electricity production from PV parks, having produced more than 4.000 MWh of energy so far.</p>
<p>Through its year-long presence, Intersolar Europe has become one of the world’s leading platforms for manufacturers, suppliers, distributors, service providers and partners of the solar industry. In the conference, trends and innovative ideas were presented, promoting the extension of the use of solar energy in the electricity production, generating a turn towards clean energy and offering the possibility of reducing the carbon footprint on the planet.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-exhibition-and-conference-intersolar-europe/">Participation in the Exhibition and Conference Intersolar Europe</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Participation in the World Hydrogen Congress</title>
		<link>https://mese.gr/en/participation-in-the-world-hydrogen-congress/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Mon, 11 Oct 2021 13:46:54 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=899</guid>

					<description><![CDATA[<p>&#160; On October 4-6 2021, the 2nd Annual World Hydrogen Congress was held at the PTA Congress Centre in Amsterdam. The Congress was attended by more than 200 speakers who play a leading role in the Hydrogen industry, covering its entire value chain. Speakers included policy and regulation makers concerning Hydrogen management, as well as...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-world-hydrogen-congress/">Participation in the World Hydrogen Congress</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>&nbsp;</p>
<p>On October 4-6 2021, the 2nd Annual World Hydrogen Congress was held at the PTA Congress Centre in Amsterdam. The Congress was attended by more than 200 speakers who play a leading role in the Hydrogen industry, covering its entire value chain. Speakers included policy and regulation makers concerning Hydrogen management, as well as Managing Directors and CTOs active in the field of Hydrogen technologies.</p>
<p>MES ENERGY S.A. executives also participated in the Congress, as Hydrogen technologies constitute a significant activity of the company. MES Energy S.A. is a pioneer in this field in Greece, having installed and commissioned the 1st Hydrogen refuelling station in the country, as well as hydrogen-powered vehicles with Hydrogen fuel cells. The World Hydrogen Congress took place at a critical time for the fast growing clean Hydrogen industry. Although Hydrogen is expected to play an important role in a fully decarbonized energy system, challenges remain to be resolved in order to achieve its complete commercialization. Through the participation in such Congresses, progress is accomplished in this direction.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/participation-in-the-world-hydrogen-congress/">Participation in the World Hydrogen Congress</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply of Electric Vehicles in the Municipality of Thessaloniki</title>
		<link>https://mese.gr/en/supply-of-electric-vehicles-in-the-municipality-of-thessaloniki/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Tue, 14 Sep 2021 18:32:52 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1220</guid>

					<description><![CDATA[<p>In 2020, the Municipality of Thessaloniki conducted an Open, International Tender for the Supply of Electric Vehicles. This action was financed by the Region of Central Macedonia, by the European Union, by the European Regional Development Fund in specific, while national resources were also used, through the Public Investment Program. MES ENERGY S.A. was selected...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-electric-vehicles-in-the-municipality-of-thessaloniki/">Supply of Electric Vehicles in the Municipality of Thessaloniki</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In 2020, the Municipality of Thessaloniki conducted an Open, International Tender for the Supply of Electric Vehicles. This action was financed by the Region of Central Macedonia, by the European Union, by the European Regional Development Fund in specific, while national resources were also used, through the Public Investment Program. MES ENERGY S.A. was selected for the supply of four electric four-wheeled trucks with tipper and four electric four-wheeled trucks with tipper and washer, which are intended to cover the needs of the Recycling and Urban Waste Management Department and of the Urban Environment Management Department of the Municipality of Thessaloniki.<br />
In this context, in July 2021, the company delivered the supplied vehicles, successfully and in accordance with the terms of the Contract with the Municipality, which are accompanied by the respective ISO quality management certificates of the manufacturer and comply with all the National and European regulations concerning the accident prevention and the protection of employees. MES ENERGY S.A. also undertook the Good Working Order Warranty of the vehicles and their batteries for 24 months. In addition to the above, the company undertook the training of the personnel and the maintainers of the vehicles, as well as the delivery of all accompanying documents.<br />
Through the above action, MES ENERGY S.A. contributed to the increase of the number of electric vehicles in the Municipality of Thessaloniki, which presents multiple advantages for the Municipality, with the most significant being the reduction of its carbon emissions. Admittedly, electric mobility is considered the future in vehicle mobility, especially in urban centers, as electric vehicles produce zero pollutants, less noise pollution compared to conventional vehicles, while at the same time presenting lower maintenance costs.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-electric-vehicles-in-the-municipality-of-thessaloniki/">Supply of Electric Vehicles in the Municipality of Thessaloniki</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Construction of Photovoltaic Stations with a Total Power of 1 MW at Locations KATSIKANIA and DOURA for ARGOLIKI ENERGY COMMUNITY Ltd</title>
		<link>https://mese.gr/en/construction-of-photovoltaic-stations-with-a-total-power-of-1-mw-at-locations-katsikania-and-doura-for-argoliki-energy-community-ltd/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Thu, 05 Aug 2021 18:34:37 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1224</guid>

					<description><![CDATA[<p>On January 18, 2021, MES ENERGY S.A. signed a Contract with ARGOLIKI ENERGY COMMUNITY Ltd for the construction of Photovoltaic Stations(PVS) with a total power of 1 MW, at the locations “Katsikania” and “Doura”, in the Municipality of Argos-Mykines, at the Regional Unit of Argolis. Therefore, MES ENERGY S.A. undertook the development, study, supply, installation...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/construction-of-photovoltaic-stations-with-a-total-power-of-1-mw-at-locations-katsikania-and-doura-for-argoliki-energy-community-ltd/">Construction of Photovoltaic Stations with a Total Power of 1 MW at Locations KATSIKANIA and DOURA for ARGOLIKI ENERGY COMMUNITY Ltd</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On January 18, 2021, MES ENERGY S.A. signed a Contract with ARGOLIKI ENERGY COMMUNITY Ltd for the construction of Photovoltaic Stations(PVS) with a total power of 1 MW, at the locations “Katsikania” and “Doura”, in the Municipality of Argos-Mykines, at the Regional Unit of Argolis. Therefore, MES ENERGY S.A. undertook the development, study, supply, installation and commissioning of two PV Stations of 499,2 kWp power each, as well as all the preparatory work, required for the Stations to be ready to operate productively on behalf of ARGOLIKI ENERGY COMMUNITY Ltd. In the construction of each Station, 934 PV panels of the leading company JA SOLAR, of type JAM-72S30-MR SERIES with 535Wp power each, two HUAWEI SUN 2000 185kVA KTL and one HUAWEI SUN 2000 105kVA KTL inverters and one Medium Voltage Substation were used, as well as all the required earthing, lighting protection and surge protection systems. In addition, to ensure the safety of the Stations, a fence and a closed-circuit television (CCTV) were installed. The monitoring of the electric values of the Stations is realized through a Control and Supervision System communicating with the inverters, while the supervision of their operation is achieved through a data monitoring and recording system. Specifically, the PLC version of SMART LOGGER is used, offering seamless data transmission via power cables. MES ENERGY S.A. also undertook the operation guarantees of the projects and delivered the relevant plans and operation manuals.<br />
On August 5, 2021, a technical inspection took place at the Stations and found that all the works for the implementation of the projects were realized successfully and in accordance with the requirements of ARGOLIKI ENERGY COMMUNITY Ltd. It is also worth mentioning that the assigned works were performed according to Greek and International standards (ΕΛΟΤ, IEC). Currently, the PV Stations are activated and successfully connected to the electric grid of HEDNO, starting their period of “Trial Operation”.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/construction-of-photovoltaic-stations-with-a-total-power-of-1-mw-at-locations-katsikania-and-doura-for-argoliki-energy-community-ltd/">Construction of Photovoltaic Stations with a Total Power of 1 MW at Locations KATSIKANIA and DOURA for ARGOLIKI ENERGY COMMUNITY Ltd</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply of LED LIghting and Central Electronic Remote Control System for Electric Lighting Networks in the Municipality of Igoumenitsa</title>
		<link>https://mese.gr/en/supply-of-led-lighting-and-central-electronic-remote-control-system-for-electric-lighting-networks-in-the-municipality-of-igoumenitsa/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Mon, 08 Feb 2021 18:39:37 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1233</guid>

					<description><![CDATA[<p>The Municipality of Igoumenitsa conducted an open, international, electronic tender for the Supply of LED Lighting and Central Electronic Remote Control System for Electric Lighting Networks. MES ENERGY S.S. was chosen for the above purpose, as it presented the most cost effective offer. Therefore, the company signed the relevant contract with the Municipality of Igoumenitsa...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-led-lighting-and-central-electronic-remote-control-system-for-electric-lighting-networks-in-the-municipality-of-igoumenitsa/">Supply of LED LIghting and Central Electronic Remote Control System for Electric Lighting Networks in the Municipality of Igoumenitsa</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The Municipality of Igoumenitsa conducted an open, international, electronic tender for the Supply of LED Lighting and Central Electronic Remote Control System for Electric Lighting Networks. MES ENERGY S.S. was chosen for the above purpose, as it presented the most cost effective offer. Therefore, the company signed the relevant contract with the Municipality of Igoumenitsa on January 8, 2021. The contract is part of the Cooperation Programme Interreg V/A Greece – Italy (EL-IT) 2014 – 2020 and was co-funded by the European Union (European Regional Development Fund ERDF), by national resources through the Public Investment Program, and by the Municipality of Igoumenitsa.</p>
<p>Under the contract, MES ENERGY S.A. undertook the upgrade of street lighting networks in the Municipality of Igoumenitsa, through the supply and installation of a central remote control system of lighting networks and 230 luminaires using LED technology – controllers for the connection to the remote control system. All luminaires were installed in existing networks, in accordance with the applicable safety regulations for the electric grids. In specific, 113 of them have single arm lighting poles and are suitable for street lighting, 105 are hanging lights, suitable for urban streets, and the remaining 12 are post lights, ideal for squares and pedestrian streets. The lighting fixtures were installed on the coastal axis, on inland streets and in the central playground of the Municipality. As for the remote control system, its implementation was completed through the appropriate Management Software, ensuring the wireless control and communication of both the controllers located inside the lighting fixtures and the area controllers – local communication nodes (Gateway), which are installed near the pillars of the lighting networks. MES ENERGY S.A. undertook the assembly, installation, connection, trial operation and delivery of the system in full operation, as well as all the material required for the proper execution of the works of the system. The company, also, undertook the training of the Municipal staff in the functions of the system, the delivery of all technical manuals concerning the installation and maintenance of lightings and the use of the remote control system, as well as the repair of faults during the warranty period.</p>
<p>The benefits resulting from the above activity are multiple. On the one hand, the old, hi-energy-consuming lightings of conventional type were replaced by new LED lightings, which have lower consumption. In addition, using the Central Electronic Remote Control System for Electric Lighting Networks, it is possible to remotely manage and supervise the lighting installations, measure the consumed energy, detect damages etc. Finally, the brightness level can be adjusted according to the requirements and needs of the area (Dimming), thus achieving additional energy saving, as excessive lighting is avoided, where and when it is not needed. Through all the above, MES ENERGY S.A. contributed to meet the needs in energy saving of the Municipality of Igoumenitsa, as well as to the reduction of operation and maintenance costs of the relevant lighting networks.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-led-lighting-and-central-electronic-remote-control-system-for-electric-lighting-networks-in-the-municipality-of-igoumenitsa/">Supply of LED LIghting and Central Electronic Remote Control System for Electric Lighting Networks in the Municipality of Igoumenitsa</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Provision of Services for the Development of the Electric-Vehicles’ Charging Stations Plan in the Municipality of Heraklion, Crete</title>
		<link>https://mese.gr/en/provision-of-services-for-the-development-of-the-electric-vehicles-charging-stations-plan-in-the-municipality-of-heraklion-crete/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Wed, 02 Dec 2020 18:41:48 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1237</guid>

					<description><![CDATA[<p>On December 2, 2020, the Municipality of Heraklion signed a contract with MES ENERGY S.A. concerning the provision of support services in the development of the Electric-Vehicles’ Charging Stations Plan, also known as S.F.I.O. This initiative aims to exploit the possibilities offered by Law 4710/2020 for the development of electromobility and its infrastructure, so as...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-services-for-the-development-of-the-electric-vehicles-charging-stations-plan-in-the-municipality-of-heraklion-crete/">Provision of Services for the Development of the Electric-Vehicles’ Charging Stations Plan in the Municipality of Heraklion, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On December 2, 2020, the Municipality of Heraklion signed a contract with MES ENERGY S.A. concerning the provision of support services in the development of the Electric-Vehicles’ Charging Stations Plan, also known as S.F.I.O. This initiative aims to exploit the possibilities offered by Law 4710/2020 for the development of electromobility and its infrastructure, so as to achieve the objectives of the National Plan for Electromobility. In order for the Municipality to respond timely to the priorities and needs that arose, the assistance of specialized consultants with experience in the field of electromobility and implementation of action plans was required. MES ENERGY S.A. was chosen for this role, using funding from municipal sources. In more detail, the company undertook the support in the development of the Electric-Vehicles’ Charging Stations Plan, which determines the location of a sufficient number of normal or high power publicly accessible charging stations for Electric Vehicles (E/V), as well as the parking spaces for E/V within the administrative boundaries of the Municipality. Initially, the company analyzed the existing situation and the mapping of the intervention area, then chose the location of charging stations of E/V and created scenarios for the development of an integrated E/V charging network and, finally, the company delivered the relevant Master Plan, as well as a monitoring method for the S.F.I.O.<br />
Some of the benefits that arise for the Municipality, through the mentioned activity, include the complete and detailed recording of the installation locations of charging stations of E/V, as well as the conduction of a Master Plan, in order for the Municipality to be ready to submit funding offers for the realization of the project concerning the creation of charging infrastructure. However, it is worth mentioning that the most important benefit remains the turn of the Municipality towards clean transportations and the reduction of its environmental footprint.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-services-for-the-development-of-the-electric-vehicles-charging-stations-plan-in-the-municipality-of-heraklion-crete/">Provision of Services for the Development of the Electric-Vehicles’ Charging Stations Plan in the Municipality of Heraklion, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Relocation of PV System for LAMDA HELLIX S.A.</title>
		<link>https://mese.gr/en/relocation-of-p-v-system-for-lamda-hellix-s-a/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Thu, 10 Sep 2020 18:59:58 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1241</guid>

					<description><![CDATA[<p>On September 10, 2020, MES ENERGY S.A. signed a contract with LAMDA HELLIX S.A. concerning the provision of services for the relocation of a PV system of 100 kWp power from an existing building of the company to a new location. In more detail, MES ENERGY S.A. undertook the licensing process for the relocation of...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/relocation-of-p-v-system-for-lamda-hellix-s-a/">Relocation of PV System for LAMDA HELLIX S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On September 10, 2020, MES ENERGY S.A. signed a contract with LAMDA HELLIX S.A. concerning the provision of services for the relocation of a PV system of 100 kWp power from an existing building of the company to a new location. In more detail, MES ENERGY S.A. undertook the licensing process for the relocation of the project, modifying the existing contracts as well as proceeding to the required licensing for the new installation site. The company also undertook the relocation process of the project, in accordance with the specifications of standards ΕΛΟΤ ΕΝ 62446 and ΕΛΟΤ HD 384 which define the requirements for the documentation, the tests, the commissioning, the inspection and the electrical installation of the project. Moreover, the company installed a grounding system in the new location, according to the standards ΕΛΟΤ 1197 and IEC EN 62305-2.</p>
<p>LAMDA HELLIX S.A. is one of the fastest growing data center service providers in Southeast Europe, Middle East and North Africa. Environmental protection is a key pillar in the company’s efforts and daily practice, present both in its functions and in the services it provides. It is worth mentioning that, through the above collaboration, MES ENERGY S.A. contributed to the shared goal of reducing the environmental footprint of the company.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/relocation-of-p-v-system-for-lamda-hellix-s-a/">Relocation of PV System for LAMDA HELLIX S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply and Installation of a Hydrogen Refueling Station using Hydrogen Fuel in the Facilities of NCSR “DEMOKRITOS”</title>
		<link>https://mese.gr/en/supply-and-installation-of-a-hydrogen-refueling-station-using-hydrogen-fuel-in-the-facilities-of-ncsr-demokritos/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Tue, 28 Jul 2020 19:04:43 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1245</guid>

					<description><![CDATA[<p>In the framework of the Operational Programme “Competitiveness, Entrepreneurship and Innovation 2014-2020”, a call for a Tender was launched, in 2020, concerning the procurement, installation, commissioning and training of operators of a Hydrogen Refueling Station in the facilities of NCSR “DEMOKRITOS”. The competition was conducted through an Open Process via the National Electronic Public Procurement...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-and-installation-of-a-hydrogen-refueling-station-using-hydrogen-fuel-in-the-facilities-of-ncsr-demokritos/">Supply and Installation of a Hydrogen Refueling Station using Hydrogen Fuel in the Facilities of NCSR “DEMOKRITOS”</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In the framework of the Operational Programme “Competitiveness, Entrepreneurship and Innovation 2014-2020”, a call for a Tender was launched, in 2020, concerning the procurement, installation, commissioning and training of operators of a Hydrogen Refueling Station in the facilities of NCSR “DEMOKRITOS”. The competition was conducted through an Open Process via the National Electronic Public Procurement System (NEPPS) and is funded by the European Union (European Regional Development Fund) and national resources, through the Ministry of Development and Investment. MES ENERGY S.A. was selected for this purpose, on the basis of criteria related to the best value for money, economic and financial adequacy, technical and professional competence, quality assurance and environmental management standards, as well as compliance with the necessary technical specifications. On 28 July 2020, MES ENERGY S.A. signed the above contract with NCSR “DEMOKRITOS”. “DEMOKRITOS” is a research center focusing on Technology and Research. Its purpose is to conduct high level basic and applied research, aiming to promote scientific and technological knowledge in Natural Sciences, as well as to support innovation. In this context, “DEMOKRITOS” cooperates with MES ENERGY S.A., in order to develop the first Hydrogen Refueling Station (HRS) in Greece, as well as the subsequent demonstration of hydrogen-powered vehicles. The final product, i.e. the integrated system of production, storage, refueling and consumption of hydrogen, will consist of five main subsystems: a photovoltaic system for energy supply, a hydrogen production system using PEM electrolysis, a hydrogen storage system, a hydrogen refueling system and hydrogen-powered vehicles with hydrogen fuel cells. Finally, it has to be mentioned that relevant projects can be part of the Fuel Cells and Hydrogen Joint Undertaking, powered by the European Union (Fuel Cells and Hydrogen Joint Undertaking – FCH JU – www.fch.europa.eu), which aims to facilitate and accelerate the market entry of these technologies, with the ultimate goal of the transition towards clean energy, as hydrogen technologies offer the opportunity for a shift to clean transportations and to the reduction of our carbon footprint on the environment.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-and-installation-of-a-hydrogen-refueling-station-using-hydrogen-fuel-in-the-facilities-of-ncsr-demokritos/">Supply and Installation of a Hydrogen Refueling Station using Hydrogen Fuel in the Facilities of NCSR “DEMOKRITOS”</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply of four Electric Vehicles and one Charging Station in the Municipality of Chania</title>
		<link>https://mese.gr/en/supply-of-four-electric-vehicles-and-one-charging-station-in-the-municipality-of-chania/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Fri, 13 Mar 2020 19:06:29 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1249</guid>

					<description><![CDATA[<p>In July 2019, a call for a Tender was launched for the signing of a contract concerning the supply of one electric minibus, three electric two-wheeled vehicles and one charging station in the Municipality of Chania. MES ENERGY S.A. was selected for this purpose, as it presented the most cost effective offer, and signed the...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-four-electric-vehicles-and-one-charging-station-in-the-municipality-of-chania/">Supply of four Electric Vehicles and one Charging Station in the Municipality of Chania</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In July 2019, a call for a Tender was launched for the signing of a contract concerning the supply of one electric minibus, three electric two-wheeled vehicles and one charging station in the Municipality of Chania. MES ENERGY S.A. was selected for this purpose, as it presented the most cost effective offer, and signed the above contract with the Municipality of Chania on March 13, 2020. The contract is part of the realization of the project: “Common Actions to Develop Green – Environmentally Friendly Tours in Tourist Areas”, also known by the acronym “ECORouTs”, which is part of the “INTERREG VA Greece-Cyprus 2014-2020” Cooperation Programme. The mentioned project is funded by the European Union (European Regional Development Fund), by Greece (Public Investment Program) and by the Municipality of Chania. In more detail, the contract includes the supply of four electric vehicles, one minibus, allowing access to people with limited mobility, and three two-wheeled vehicles, with batteries (Battery Electric Vehicles – BEV) that offer autonomy for 100km/charge, whose movement is supplied exclusively from electricity stored in Lithium technology deep charge / discharge batteries with energy management system (EMS). The Contract also includes the supply and installation of a charging station compatible with the supplied vehicles at a selected and appropriate location of the municipal facilities. Additionally, due to the electric vehicles’ different driving features and maintenance needs compared to the conventional vehicles, the company undertook the training of the staff of the Municipality of Chania, which took place at the premises of the Municipality. Finally, it is worth mentioning that the above activity, in addition to serving the needs of the Municipality in vehicles, aims to encourage citizens to use low or zero emissions vehicles, thus contributing to the reduction of the environmental footprint caused by public transport.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-four-electric-vehicles-and-one-charging-station-in-the-municipality-of-chania/">Supply of four Electric Vehicles and one Charging Station in the Municipality of Chania</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply and Maintenance of an Electric Bus and a Charging Station in the Municipality of Paphos</title>
		<link>https://mese.gr/en/supply-and-maintenance-of-an-electric-bus-and-a-charging-station-in-the-municipality-of-paphos/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Thu, 19 Dec 2019 19:07:53 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1253</guid>

					<description><![CDATA[<p>In the framework of the INTERREG V-A Cooperation Program Greece-Cyprus 2014-2020, a call for Tender was launched, in 2019, for the conclusion of a contract for the supply and maintenance of an electric bus, as well as for the supply, installation and maintenance of an electric vehicle charging station in the Municipality of Paphos. The...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-and-maintenance-of-an-electric-bus-and-a-charging-station-in-the-municipality-of-paphos/">Supply and Maintenance of an Electric Bus and a Charging Station in the Municipality of Paphos</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In the framework of the INTERREG V-A Cooperation Program Greece-Cyprus 2014-2020, a call for Tender was launched, in 2019, for the conclusion of a contract for the supply and maintenance of an electric bus, as well as for the supply, installation and maintenance of an electric vehicle charging station in the Municipality of Paphos. The program was co-funded by the European Union (ERDF) and by national resources of Greece and Cyprus. MES ENERGY S.A. managed to be selected for the above purpose, based on criteria regarding the most economical offer, and signed the aforementioned contract with the Municipality of Paphos on the 19th of December 2019. Specifically, the company undertook the supply of a fully electric bus, with at least 20 seats, access and space for one wheelchair and a seat for the transport of bicycles, as well as its maintenance, preventive or corrective, for a period of two years. At the same time, the company was responsible for the training of drivers and technicians from the Municipality of Paphos in the use and operational parameters of the vehicle. In addition, MES ENERGY S.A. was entrusted with the supply and installation of a fast charging station for electric vehicles, as well as its maintenance for a period of two years. Regarding the charging station, which was installed in full operational mode in a public site in the Municipality of Paphos, the company was responsible for the execution of all the necessary electrical, construction and technical work required for its installation, as well as for the preparation of electrical studies, in order to ensure its proper operation. Finally, it is worth mentioning that, always in collaboration with the Municipality of Paphos, MES ENERGY S.A., through the above activity, contributes to the reduction of carbon dioxide emissions caused by transportations, realizing its vision for a future focused on clean energy.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-and-maintenance-of-an-electric-bus-and-a-charging-station-in-the-municipality-of-paphos/">Supply and Maintenance of an Electric Bus and a Charging Station in the Municipality of Paphos</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Support of CRES in the Implementation of the Capitalization of the SHERPA Programme</title>
		<link>https://mese.gr/en/support-of-cres-in-the-implementation-of-the-capitalization-of-the-sherpa-programme/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Wed, 13 Nov 2019 19:09:42 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1257</guid>

					<description><![CDATA[<p>In 2019, the Center For Renewable Energy Sources (CRES) conducted a tender and launched a call for offers concerning the provision of the service entitled: “Planning and implementation of actions for the capitalization of the results of the SHERPA project, on national and European level”. This service was included in the framework of the realization...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/support-of-cres-in-the-implementation-of-the-capitalization-of-the-sherpa-programme/">Support of CRES in the Implementation of the Capitalization of the SHERPA Programme</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In 2019, the Center For Renewable Energy Sources (CRES) conducted a tender and launched a call for offers concerning the provision of the service entitled: “Planning and implementation of actions for the capitalization of the results of the SHERPA project, on national and European level”. This service was included in the framework of the realization of the Project SHared knowledge for Energy Renovations in buildings by Public Administrations (“SHERPA”) of the Interreg MED 2014-2020 Project, which was co-funded by the European Regional Development Fund (ERDF) and by national resources (Public Investment Program). MES ENERGY was selected for the above purpose, as it presented the most economical offer, based on an optimal value for money, and signed the corresponding contract with CRES on November 13, 2019. CRES participated as a Partner and coordinator of Work Package 5 (Capitalization), in the European Project “SHERPA”. 12 Partners from 6 Mediterranean countries (Spain, France, Italy, Greece, Malta, Croatia) and 12 “Supporting” Partners participated in the aforementioned Project. The Project, contributing to the transnational cooperation on the improvement of energy efficiency of public buildings, aimed at strengthening the capacity of Public Authorities on a regional and local level in the Mediterranean Countries, in order to energy upgrade public buildings, by emphasizing the importance of coordinated activity between regional and local authorities, in line with national policies.<br />
The actions of the Project were structured around five Packages, the last of which is the Capitalization, i.e. “the organization of information concerning the implementation of programs, projects, their results and the methods used, so that the accumulated experience can be used in other programs or projects”. The objectives of the Capitalization included the development of an online platform and the preparation of the Joint Action Plan of the SHERPA Project. According to the contract, MES ENERGY S.A.undertook the provision of services of planning, implementation and monitoring of the activities of capitalization of the results of the SHERPA Project, on a national and European level. In more detail, the company initially undertook the preparation of the Capitalization Plan and the results of the SHERPA Project in the participating countries in the Mediterranean and Europe in general. Additionally, the company undertook the mobilization of target groups, especially from the 6 countries involved in SHERPA, to actively participate in capitalization activities, such as joining the Joint Action Plan, participating in Regional workshops relevant to the project, and other events concerning energy saving in buildings, subscribing and using the online capitalization platform of the project, etc. Finally, MES ENERGY S.A. undertook the design, implementation, coordination and operation of an online platform containing both the Online Capitalization Forum, aiming at networking, technical expertise exchange and developing synergies, on a Mediterranean level, regarding the energy efficiency of public buildings, by using the results of the SHERPA Project, as well as four Capitalization Set of Toolkits, that consist a “library” of useful tools and information available to anyone concerned on energy upgrade of buildings.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/support-of-cres-in-the-implementation-of-the-capitalization-of-the-sherpa-programme/">Support of CRES in the Implementation of the Capitalization of the SHERPA Programme</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply of Electric Buses and Charging Stations in the Municipality of Heraklion</title>
		<link>https://mese.gr/en/supply-of-electric-buses-and-charging-stations-in-the-municipality-of-heraklion/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Tue, 15 Oct 2019 19:12:11 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1263</guid>

					<description><![CDATA[<p>In March 2019, a call for a Tender was launched for the conclusion of a Contract for the supply of two electric buses and the installation of their accompanying charging stations. The Contract concerns the Municipality of Heraklion, within the framework of “Innovation Zero Pollution Vehicles”, which is part of the realization of the project:...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-electric-buses-and-charging-stations-in-the-municipality-of-heraklion/">Supply of Electric Buses and Charging Stations in the Municipality of Heraklion</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In March 2019, a call for a Tender was launched for the conclusion of a Contract for the supply of two electric buses and the installation of their accompanying charging stations. The Contract concerns the Municipality of Heraklion, within the framework of “Innovation Zero Pollution Vehicles”, which is part of the realization of the project: “Common Actions to Develop Green – Environmentally Friendly Tours in Tourist Areas”, also known by the acronym “ECORouTs”, which is part of the “INTERREG VA Greece-Cyprus 2014-2020” Cooperation Programme. The program is funded by the European Union (European Regional Development Fund), by Greece (Public Investment Program), Cyprus and the Municipality of Heraklion. MES ENERGY S.A. was selected for this purpose, as it presented the most cost effective offer, and signed the Contract on October 15, 2019. As a result, the company undertook the supply of two electric buses with a capacity of at least 30 people each, as well as access and space for one wheelchair. The buses have an autonomy of 120km, full charge capacity in less than 8 hours, easy battery replacement between shifts (Quick Fit Battery System), electronic energy recovery system during braking and deceleration of the vehicle, as well as built-in charger (“on-board charger ”).<br />
In addition, the mentioned electric buses produce zero pollutants and they have a small size but sufficient capacity, in order to meet the needs of visitors and residents of the Municipality of Heraklion in specific areas with attractions, such as the historic city center. MES ENERGY S.A. also undertook the supply and installation of two charging stations for the aforementioned vehicles. The route of the buses and the location of the charging stations were selected with respect to the environment and on the basis of the optimal route, in order to ensure the necessary time for the charging of the buses. Furthermore, due to the electric vehicles’ different driving features and maintenance needs compared to the conventional ones, the company undertook the training of the staff of the Municipality of Heraklion, which took place at the premises of the Municipality, in order to optimize the performance of the buses, given their special characteristics. It is also worth mentioning that electric buses present many advantages over conventional ones, such as cheaper and easier maintenance and repair, reduced risk of ignition, as they do not use fuel, and decreased noise emissions.<br />
However, their most important advantage remains the zero pollutants emission. Thus, through this project, MES ENERGY S.A. contributes to the satisfaction of the needs of both the local population and visitors of the Μunicipality for transportation, without a parallel burden on the natural environment.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-of-electric-buses-and-charging-stations-in-the-municipality-of-heraklion/">Supply of Electric Buses and Charging Stations in the Municipality of Heraklion</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply and Installation of Equipment of a PV System for TEMAK S.A.</title>
		<link>https://mese.gr/en/supply-and-installation-of-equipment-of-a-pv-system-for-temak-sa/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Fri, 17 May 2019 19:13:55 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1268</guid>

					<description><![CDATA[<p>On May 17, 2019, MES ENERGY S.A. signed an agreement for the supply and installation of equipment for TEMAK S.A. Therefore, the company undertook the study, the licensing, the procurement, the installation and the commissioning of a PV station of 67,275 kWp. The station operates under the net-metering mechanism and was installed at the premises...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-and-installation-of-equipment-of-a-pv-system-for-temak-sa/">Supply and Installation of Equipment of a PV System for TEMAK S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On May 17, 2019, MES ENERGY S.A. signed an agreement for the supply and installation of equipment for TEMAK S.A. Therefore, the company undertook the study, the licensing, the procurement, the installation and the commissioning of a PV station of 67,275 kWp. The station operates under the net-metering mechanism and was installed at the premises of TEMAK S.A. The construction of the PV station was realized in accordance with the standards ΕΛΟΤ ΕΝ 62446, which refers to the connection of the station to the electric grid, and ΕΛΟΤ HD 384, referring to the requirements of the electric installations that a station shall meet. It is worth noting that, through the above collaboration, the reduction of the carbon footprint of TEMAK S.A. was achieved, while contributing to the turn towards renewable sources in energy production.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-and-installation-of-equipment-of-a-pv-system-for-temak-sa/">Supply and Installation of Equipment of a PV System for TEMAK S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Establishment of an Energy Community in the Municipality of Heraklion, Crete</title>
		<link>https://mese.gr/en/establishment-of-an-energy-community-in-the-municipality-of-heraklion-crete/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Wed, 08 May 2019 19:16:40 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1272</guid>

					<description><![CDATA[<p>The Municipality of Heraklion and the supervised legal entities present high electrical consumption in its infrastructure, including schools, buildings, lightning clocks, pumping stations etc, and have high yearly expenses due to this consumption. The main objective of the Municipality concerns the reduction of electricity costs, as well as the treatment of energy poverty of vulnerable...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/establishment-of-an-energy-community-in-the-municipality-of-heraklion-crete/">Establishment of an Energy Community in the Municipality of Heraklion, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The Municipality of Heraklion and the supervised legal entities present high electrical consumption in its infrastructure, including schools, buildings, lightning clocks, pumping stations etc, and have high yearly expenses due to this consumption. The main objective of the Municipality concerns the reduction of electricity costs, as well as the treatment of energy poverty of vulnerable consumers or citizens within its territory. The establishment of an Energy Community in which the Municipality participates contributed to this end and allowed the utilization of possibilities provided by Ν.4513/2018, as well as, through the synergy with other Local Authorities, Legal Entities or citizens, the installation of RES stations. Therefore, in 2019, the Municipality launched a call concerning the “Support in the creation of an Energy Community, based on Ν.4513/2018, with the participation of the Municipality and the preparation of funding proposals, with the aim to utilize Renewable Energy Sources and reduce costs for the Municipality and the citizens”. ME<br />
According to the contract, the company undertook the provision of scientific, technical and administrative support to the Municipality in the investigation of specific proposals for the creation of an Energy Community. In more detail, MES ENERGY S.A. undertook the recording of cases of examination and the collection of consumptions, the recording of possibilities for the installation of RES systems, the recording of business models, the support of the Municipality in contacts with other entities, the draft statutes of the Energy Community, the creation of informational material and the support of the Municipality in informing citizens about the Energy Community. In this way, MES ENERGY S.A. contributed in the partial covering of the Municipality’s energy needs, in the offer of facilities to citizens below the poverty line, while at the same time it promoted the reduction of electricity expenses used in the municipal installations and the reduction of the Municipality’s carbon footprint. Finally, it is worth noting that a study for the installation of PV systems with a total power of 2450 kWp in the Municipality resulted in significant CO2 emission savings of up to 125,715 tonnes, during 25 years of operation.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/establishment-of-an-energy-community-in-the-municipality-of-heraklion-crete/">Establishment of an Energy Community in the Municipality of Heraklion, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Provision of Consulting Services on Energy Issues in the Municipality of Chania, Crete</title>
		<link>https://mese.gr/en/provision-of-consulting-services-on-energy-issues-in-the-municipality-of-chania-crete/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Fri, 21 Dec 2018 19:18:25 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1276</guid>

					<description><![CDATA[<p>On December 21, 2018, the Municipality of Chania signed a contract with MES ENERGY S.A. for the provision of services on issues concerning the electrical interconnection and net metering of municipal buildings with HEDNO. The Municipality of Chania possesses a number of energy-consuming facilities in which significant amounts of electricity are spent yearly, while releasing...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-consulting-services-on-energy-issues-in-the-municipality-of-chania-crete/">Provision of Consulting Services on Energy Issues in the Municipality of Chania, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On December 21, 2018, the Municipality of Chania signed a contract with MES ENERGY S.A. for the provision of services on issues concerning the electrical interconnection and net metering of municipal buildings with HEDNO. The Municipality of Chania possesses a number of energy-consuming facilities in which significant amounts of electricity are spent yearly, while releasing a large volume of carbon dioxide at the same time. The Municipality, however, presents various possibilities for energy saving and RES usage, especially in Crete, where the available RES potential is abundant. These possibilities, in combination with the opportunities for the improvement of facilities through the available funding programs, constitute one of the current development priorities of the Municipality. In order to meet the priorities and needs that arise timely and successfully, the assistance of specialized consultants, with experience in energy saving, in clean technology applications, in the institutional framework of energy saving and RES and in the reduction of the carbon footprint of building facilities, was asked. In this context, using municipal funding, MES ENERGY S.A. undertook the role of a Technical Advisor on energy issues, through the support of the Municipality in the preparation of funding proposals with the aim of energy upgrade of municipal facilities and of electricity production in the municipal infrastructure, using PV systems with the application of net metering. In more detail, MES ENERGY S.A. undertook the recording of cases and the collection of consumption data, the recording of possibilities for the installation of PV systems using net metering or virtual net metering, the preparation of a Master Plan based on the above data, and, lastly, the assessment of carbon dioxide emissions for the proposed interventions, as well as the preparation of applications for HEDNO. It is also worth mentioning that this activity presents multiple benefits for the Municipality of Chania concerning, in addition to the complete detailed description of interventions needed to achieve lower carbon emissions, the reduction of operating costs and the environmental footprint of municipal facilities. Through this cooperation, MES ENERGY S.A. contributed to the improvement of energy efficiency and RES usage in the building infrastructure of the Municipality and to the shared goal for a turn towards green energy and greenhouse gas emissions reduction.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-consulting-services-on-energy-issues-in-the-municipality-of-chania-crete/">Provision of Consulting Services on Energy Issues in the Municipality of Chania, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Provision of Consulting Services in the Municipality of Platanias, Crete</title>
		<link>https://mese.gr/en/provision-of-consulting-services-in-the-municipality-of-platanias-crete/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Sat, 08 Sep 2018 19:20:19 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1280</guid>

					<description><![CDATA[<p>On August 9, 2018 the Municipality of Platanias,Crete, signed a contract with MES ENERGY S.A., concerning the Provision of Consulting Services for the investigation of energy saving proposals and for the reduction of the carbon footprint in the facilities of the Municipality. The Municipality has the potential for energy saving solutions and RES usage. This...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-consulting-services-in-the-municipality-of-platanias-crete/">Provision of Consulting Services in the Municipality of Platanias, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On August 9, 2018 the Municipality of Platanias,Crete, signed a contract with MES ENERGY S.A., concerning the Provision of Consulting Services for the investigation of energy saving proposals and for the reduction of the carbon footprint in the facilities of the Municipality. The Municipality has the potential for energy saving solutions and RES usage. This potential, combined with the opportunities to improve its installations using the available funding programs, constitute one of the development priorities of the Municipality. In order to meet its development priorities and needs properly and in time, the assistance of specialized consultants with experience in the field of energy saving, in applied clean technologies, in the institutional framework of energy saving and RES and in the reduction of the carbon footprint in building facilities was asked. In this context, with the financial resources of the Municipality, MES ENERGY S.A.  undertook the support in the preparation of a financing proposal for the Operational Program “Crete” 2014-2020. In more detail, MES ENERGY S.A. undertook the provision of consulting services, whose purpose was the design of specific proposals to save energy and reduce the carbon footprint of buildings of the Municipality, with the ultimate goal of receiving funding for the above actions from the Operational Program “Crete”. The aforementioned consulting services aimed at the participation in programs in order to ensure the money required to execute energy saving projects in the Buildings of the Municipality of Platanias. Therefore, MES ENERGY S.A. undertook the recording of the buildings and the collection of their consumption data, the recording of the possibilities of energy upgrading, energy saving and exploitation of Renewable Energy Sources, the elaboration of a detailed Master Plan, in which the given situation was assessed, the assessment of the carbon dioxide savings from the interventions and, finally, the preparation of licensing dossiers. It is worth mentioning that the above activity presents multiple benefits for the Municipality of Platanias, that concern, in addition to the complete and detailed energy recording of the building facilities, so that the Municipality is ready to submit financing proposals, saving resources for the operation of its facilities as well as the reduction of its carbon footprint. Through the above cooperation, MES ENERGY S.A. contributes to the improvement of the energy profile of the Municipality, as well as to the drastic reduction of the carbon emissions.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-consulting-services-in-the-municipality-of-platanias-crete/">Provision of Consulting Services in the Municipality of Platanias, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Provision of Services for the Investigation and Categorization of Buildings in the Municipality of Heraklion, Crete</title>
		<link>https://mese.gr/en/provision-of-services-for-the-investigation-and-categorization-of-buildings-in-the-municipality-of-heraklion-crete/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Wed, 30 Aug 2017 19:22:16 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1285</guid>

					<description><![CDATA[<p>The Municipality of Heraklion launched a call for a Tender, in 2017, for the provision of Services for the Investigation of municipal buildings and their categorization in representative Typologies, in the framework of the project “Integrated Management Support for Energy efficiency in Mediterranean PUblic buiLdings-IMPULSE (1MED15_2.1_M2_178)”, which is part of the transnational European Cooperation Programme...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-services-for-the-investigation-and-categorization-of-buildings-in-the-municipality-of-heraklion-crete/">Provision of Services for the Investigation and Categorization of Buildings in the Municipality of Heraklion, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The Municipality of Heraklion launched a call for a Tender, in 2017, for the provision of Services for the Investigation of municipal buildings and their categorization in representative Typologies, in the framework of the project “Integrated Management Support for Energy efficiency in Mediterranean PUblic buiLdings-IMPULSE (1MED15_2.1_M2_178)”, which is part of the transnational European Cooperation Programme for the Mediterranean area, “INTERREG MED” 2014-2020. The program was co-funded by the European Regional Development Fund (ERDF), by national resources (Public Investment Program) and by the Municipal budget. MES ENERGY S.A. was selected for the above purpose, having presented the most economical offer, based on an optimal value for money, and signed the relevant contract with the Municipality of Heraklion on August 30, 2017. Therefore, MES ENERGY S.A. undertook the definition of an initial, representative sample of municipal buildings in the Municipality of Heraklion, that combine potential for energy saving solutions, high preference or priority and high usage. Subsequently, the company undertook the definition of criteria and the categorization process of municipal buildings in Typologies, as well as the technical description of each Typology of buildings. In addition, during the implementation of the aforementioned project, the Municipality of Heraklion cooperated with the Coordinating Partner of IMPULSE, the Center for Renewable Energy Sources and Saving (CRES), with the aim of techno-economic analysis and evaluation of optimal and feasible energy efficiency measures concerning the upgrade of municipal buildings. In this context, MES ENERGY S.A. undertook the support of Municipal Services, delivering a technical report for the evaluation of the energy upgrade measures of the buildings. It is worth noting that the above cooperation was realised for the collection and categorization of data meant to be used by the Municipality in the integrated design of energy efficiency interventions in public buildings, in a reliable and affordable way, in order to upgrade the buildings and, consequently, in order to reduce their environmental footprint.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-services-for-the-investigation-and-categorization-of-buildings-in-the-municipality-of-heraklion-crete/">Provision of Services for the Investigation and Categorization of Buildings in the Municipality of Heraklion, Crete</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Provision of Consulting Services for the Organization for the Development of Crete S.A.</title>
		<link>https://mese.gr/en/provision-of-consulting-services-for-the-organization-for-the-development-of-crete-s-a/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Thu, 06 Apr 2017 19:23:48 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1290</guid>

					<description><![CDATA[<p>In 2017, the Organization for the Development of Crete S.A. (O.A.K. S.A.) launched a Tender for the provision of specialized scientific consulting services in the support of the realization and dissemination of the results of the Project “Installation of PV System and Water Tanks O.A.K. S.A. &#38; Autonomy of Water Pumping Stations”. O.A.K. S.A. has...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-consulting-services-for-the-organization-for-the-development-of-crete-s-a/">Provision of Consulting Services for the Organization for the Development of Crete S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In 2017, the Organization for the Development of Crete S.A. (O.A.K. S.A.) launched a Tender for the provision of specialized scientific consulting services in the support of the realization and dissemination of the results of the Project “Installation of PV System and Water Tanks O.A.K. S.A. &amp; Autonomy of Water Pumping Stations”. O.A.K. S.A. has included the mentioned project in the funding program of the European Economic Area (EEA) and specifically in the thematic area “GR03- Renewable Energy Sources”, while the project was co-funded by member countries of EEA (Iceland, Liechtenstein, Norway) and by the Public Investment Program of Greece (2016ΣΑΕ 0618000-1). MES ENERGY S.A. was selected for the above purpose, as it presented the most economical offer, based on the optimal value for money, and signed the corresponding Contract with O.A.K. S.A. on April 6, 2017.<br />
Therefore, the company undertook the scientific support of O.A.K during the implementation of two sub-projects: the supply and installation of PV systems, autonomous pumps and metering equipment in a water pumping tank and the dissemination of the results of the above action. Regarding the first sub-project, MES ENERGY undertook the scientific support in the management of the project, in the development and application of methodology for its monitoring, in measuring and checking the results of studies concerning the construction and function of the project, as well as in the supervision of its construction, by undertaking specialized services such as measuring the hydraulic and electric quantities, checking the static adequacy of water tanks, conducting simulations and presenting reports, records and evaluations prior to and following the realization of the project. As for the second sub-project, the company undertook the dissemination of the results of the act, through an action plan including an informative workshop, brochures, production of informative content for people with disabilities, an information stand, update of the relevant website, creation of an advertising video, aiming at informing and raising awareness of the feasibility and benefits of the act. In that way, MES ENERGY S.A. contributed to the energy upgrade of Crete and to its turn to Renewable Energy Sources, a change capable of producing significant economic and ecological results.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/provision-of-consulting-services-for-the-organization-for-the-development-of-crete-s-a/">Provision of Consulting Services for the Organization for the Development of Crete S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Supply and Installation of LED Lighting at the Mornos Dam</title>
		<link>https://mese.gr/en/supply-and-installation-of-led-lighting-at-the-mornos-dam/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Tue, 28 Mar 2017 19:25:24 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1295</guid>

					<description><![CDATA[<p>The Athens Water Supply and Sewerage Company (EYDAP S.A.) launched a call for a Tender, in 2016, concerning the supply, installation and commissioning of energy saving LED luminaires for the lighting of Mornos Dam. MES ENERGY S.A. was selected for this project, as it presented the most cost efficient offer. The Contract between the company...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-and-installation-of-led-lighting-at-the-mornos-dam/">Supply and Installation of LED Lighting at the Mornos Dam</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The Athens Water Supply and Sewerage Company (EYDAP S.A.) launched a call for a Tender, in 2016, concerning the supply, installation and commissioning of energy saving LED luminaires for the lighting of Mornos Dam. MES ENERGY S.A. was selected for this project, as it presented the most cost efficient offer. The Contract between the company and EYDAP S.A. was signed on March 28, 2017. Based on the Contract, MES ENERGY S.A. undertook the replacement of the previous 65 luminaires on the road of the crown of Mornos dam with new LED technology luminaires, thus ensuring the safety of the dam and its workers. LED lighting presents many advantages, such as minimal maintenance, good performance- consumption ratio, immediate ignition, zero illuminance degradation during their lifetime, ability to operate at extreme temperatures, with an operating range from -25 to +50 degrees celsius, as well as an increased lifetime of over 50.000 hours, which translates to 12 hours of daily operation for 11,4 years for each luminaire. However, the most important advantage of LED lighting concerns their energy saving ability, which can reach up to 70% compared to the conventional lighting of lower performance. Therefore, due to all the benefits mentioned above, LED luminaires are considered the optimal solution for street lighting, as well as a variety of applications , as they combine good quality of lighting with low energy consumption.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/supply-and-installation-of-led-lighting-at-the-mornos-dam/">Supply and Installation of LED Lighting at the Mornos Dam</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Consultant Services to the Cooperative Bank of Chania</title>
		<link>https://mese.gr/en/consultant-services-to-the-cooperative-bank-of-chania/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Sun, 01 Nov 2015 19:26:54 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1300</guid>

					<description><![CDATA[<p>On November 1st, 2015, MES ENERGY S.A. signed a contract for the provision of consulting services to the Cooperative bank of Chania. The Bank expressed interest in investing in a Wind Farm project of 2.55 MW power. In this context, the Bank assigned to MES ENERGY S.A. the conduction of the technical and licensing check...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/consultant-services-to-the-cooperative-bank-of-chania/">Consultant Services to the Cooperative Bank of Chania</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On November 1st, 2015, MES ENERGY S.A. signed a contract for the provision of consulting services to the Cooperative bank of Chania. The Bank expressed interest in investing in a Wind Farm project of 2.55 MW power. In this context, the Bank assigned to MES ENERGY S.A. the conduction of the technical and licensing check for the implementation of the above project. In this way, the company contributed to the expansion of the Bank’s activities focused on clean energy, with the aim of reducing the burden on the environment.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/consultant-services-to-the-cooperative-bank-of-chania/">Consultant Services to the Cooperative Bank of Chania</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Integrated System for the Measuring and Recording of Electric and Thermal Energy and Energy Saving Automations in Building of the Hellenic Ministry of National Defence</title>
		<link>https://mese.gr/en/integrated-system-for-the-measuring-and-recording-of-electric-and-thermal-energy-and-energy-saving-automations-in-building-of-the-hellenic-ministry-of-national-defence/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Mon, 26 Oct 2015 19:30:12 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1310</guid>

					<description><![CDATA[<p>MES Energy S.A. successfully completed the project “Integrated system for the measuring and recording of electric and thermal energy and energy saving automations in dormitory building in a Camp of the Hellenic Ministry of National Defence, for the project LIFE11 ENV/GR/938 – MECM”. The project LIFE11 ENV/GR/938 “Military Energy and Carbon Management”, is implemented using...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/integrated-system-for-the-measuring-and-recording-of-electric-and-thermal-energy-and-energy-saving-automations-in-building-of-the-hellenic-ministry-of-national-defence/">Integrated System for the Measuring and Recording of Electric and Thermal Energy and Energy Saving Automations in Building of the Hellenic Ministry of National Defence</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES Energy S.A. successfully completed the project “Integrated system for the measuring and recording of electric and thermal energy and energy saving automations in dormitory building in a Camp of the Hellenic Ministry of National Defence, for the project LIFE11 ENV/GR/938 – MECM”.</p>
<p>The project LIFE11 ENV/GR/938 “Military Energy and Carbon Management”, is implemented using european and national resources and concerns the Environmental and Energy Management in Armed Forces and, in particular, the development and application of an Energy Management System in three (3) Camps of the Hellenic Ministry of National Defence, according to the standard ΕΛΟΤ EN ISO 50001:2011. The selected camps are the 110th Battle Wing in Larissa, the Naval Station of Crete in Souda and the &#8220;Triantafyllidis&#8221; Camp in Xanthi. In the implementation of the project, the Hellenic Ministry of National Defence participates as the beneficiary coordinator and the CRES as a co-beneficiary.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/integrated-system-for-the-measuring-and-recording-of-electric-and-thermal-energy-and-energy-saving-automations-in-building-of-the-hellenic-ministry-of-national-defence/">Integrated System for the Measuring and Recording of Electric and Thermal Energy and Energy Saving Automations in Building of the Hellenic Ministry of National Defence</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>SMART IN MED &#8211; Interregional Strategic Cooperation for the Capacity Building in Energy Innovation in the Mediterranean</title>
		<link>https://mese.gr/en/smart-in-med-interregional-strategic-cooperation-for-the-capacity-building-in-energy-innovation-in-the-mediterranean/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Mon, 26 Oct 2015 19:28:35 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1304</guid>

					<description><![CDATA[<p>MES ENERGY S.A. successfully completed the project “Investigation, identification and business plan development services for Small and Medium Enterprises (SME) in Attica in the RES and Energy Efficiency field and pilot application of the models in real companies”, in the frameworks of “SMART IN MED &#8211; Interregional Strategic Cooperation for the Capacity Building in Energy...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/smart-in-med-interregional-strategic-cooperation-for-the-capacity-building-in-energy-innovation-in-the-mediterranean/">SMART IN MED &#8211; Interregional Strategic Cooperation for the Capacity Building in Energy Innovation in the Mediterranean</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. successfully completed the project “Investigation, identification and business plan development services for Small and Medium Enterprises (SME) in Attica in the RES and Energy Efficiency field and pilot application of the models in real companies”, in the frameworks of “SMART IN MED &#8211; Interregional Strategic Cooperation for the Capacity Building in Energy Innovation in the Mediterranean”.</p>
<p>The company undertook the design of a variety of business models and the selection of those to be implemented as a pilot, the development of a methodology for the selection of suitable business models for the Mediterranean regions participating in SMART IN MED, the identification of critical issues by SME users and the realisation of the pilot application of the selected model in SME of Attica in the RES and Energy Efficiency field.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/smart-in-med-interregional-strategic-cooperation-for-the-capacity-building-in-energy-innovation-in-the-mediterranean/">SMART IN MED &#8211; Interregional Strategic Cooperation for the Capacity Building in Energy Innovation in the Mediterranean</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>GRASP &#8211; MED Application Demonstration Action Plan for the Energy Upgrade of Selected Municipal Buildings in the Municipality of Spata &#8211; Artemida</title>
		<link>https://mese.gr/en/grasp-med-application-demonstration-action-plan-for-the-energy-upgrade-of-selected-municipal-buildings-in-the-municipality-of-spata-artemida/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Fri, 23 Oct 2015 19:31:37 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1314</guid>

					<description><![CDATA[<p>MES ENERGY S.A. successfully completed the project “GRASP &#8211; MED application demonstration action plan, using the GRASP project platform, for the energy upgrade of selected Municipal Buildings in the Municipality of Sparta &#8211; Artemida”. The company undertook the provision of Supporting Consultant services in the development of an action plan with pilot application terms of...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/grasp-med-application-demonstration-action-plan-for-the-energy-upgrade-of-selected-municipal-buildings-in-the-municipality-of-spata-artemida/">GRASP &#8211; MED Application Demonstration Action Plan for the Energy Upgrade of Selected Municipal Buildings in the Municipality of Spata &#8211; Artemida</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. successfully completed the project “GRASP &#8211; MED application demonstration action plan, using the GRASP project platform, for the energy upgrade of selected Municipal Buildings in the Municipality of Sparta &#8211; Artemida”. The company undertook the provision of Supporting Consultant services in the development of an action plan with pilot application terms of the findings of the GRASP project, and in particular, of the platform for the selection of “green” products / technologies, with application in the buildings</p>
<p>1st Primary School of Artemida<br />
5th Primary School of Artemida<br />
Cultural Center of Spata &#8220;Christos Bekas&#8221;</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/grasp-med-application-demonstration-action-plan-for-the-energy-upgrade-of-selected-municipal-buildings-in-the-municipality-of-spata-artemida/">GRASP &#8211; MED Application Demonstration Action Plan for the Energy Upgrade of Selected Municipal Buildings in the Municipality of Spata &#8211; Artemida</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Energia.gr &#8211; “Faces in the Current Affairs”: Feature of Dr. Panagiotis Zervas, Director of Research &#038; Development in MES ENERGY S.A.</title>
		<link>https://mese.gr/en/energia-gr-faces-in-the-current-affairs-feature-of-dr-panagiotis-zervas-director-of-research-development-in-mes-energy-s-a/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Tue, 06 Oct 2015 18:36:57 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1229</guid>

					<description><![CDATA[<p>Extensive article presenting the work of Dr. Panagiotis Zervas, Director of Research &#38; Development in MES ENERGY S.A., was published in the website Energia.gr in the section “Faces in the Current Affairs”, as one of the pioneers in Hydrogen Technology in Greece. See the full article here</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/energia-gr-faces-in-the-current-affairs-feature-of-dr-panagiotis-zervas-director-of-research-development-in-mes-energy-s-a/">Energia.gr &#8211; “Faces in the Current Affairs”: Feature of Dr. Panagiotis Zervas, Director of Research &#038; Development in MES ENERGY S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Extensive article presenting the work of Dr. Panagiotis Zervas, Director of Research &amp; Development in MES ENERGY S.A., was published in the website Energia.gr in the section “Faces in the Current Affairs”, as one of the pioneers in Hydrogen Technology in Greece.</p>
<p>See the full article <a href="https://www.energia.gr/article/98328/dr-panagioths-zervas-dnths-ereynas--anaptyxhs-ths--mes-energy-ae-enas-apo-toys-protoporoys-ton-tehnologion-ydrogonoy-sthn-ellada">here</a></p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/energia-gr-faces-in-the-current-affairs-feature-of-dr-panagiotis-zervas-director-of-research-development-in-mes-energy-s-a/">Energia.gr &#8211; “Faces in the Current Affairs”: Feature of Dr. Panagiotis Zervas, Director of Research &#038; Development in MES ENERGY S.A.</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Intelligent Greenhouse Unit – Technical Institute of Kalamata</title>
		<link>https://mese.gr/en/intelligent-greenhouse-unit-technical-institute-of-kalamata/</link>
		
		<dc:creator><![CDATA[toastedweb]]></dc:creator>
		<pubDate>Mon, 11 May 2015 19:37:16 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://mese.gr/?p=1328</guid>

					<description><![CDATA[<p>MES ENERGY S.A. completed the Procurement, Installation and Operation of Automatic Control System (SCADA) of an intelligent greenhouse unit, in the TEI of Kalamata. The company was responsible for the procurement of equipment and for its operation under the Act “Archimedes III – Support of Research Teams in Kalamata TEI ‘, namely the sub-project entitled”...</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/intelligent-greenhouse-unit-technical-institute-of-kalamata/">Intelligent Greenhouse Unit – Technical Institute of Kalamata</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>MES ENERGY S.A. completed the Procurement, Installation and Operation of Automatic Control System (SCADA) of an intelligent greenhouse unit, in the TEI of Kalamata. The company was responsible for the procurement of equipment and for its operation under the Act “Archimedes III – Support of Research Teams in Kalamata TEI ‘, namely the sub-project entitled” Intelligent Greenhouse unit with automated use of RES’, based on the relevant signed contract. The project was funded by the Special Account &amp; amp; Research TEI Peloponnese.</p>
<p>The post <a rel="nofollow" href="https://mese.gr/en/intelligent-greenhouse-unit-technical-institute-of-kalamata/">Intelligent Greenhouse Unit – Technical Institute of Kalamata</a> appeared first on <a rel="nofollow" href="https://mese.gr/en/">MES Energy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
