Supply and Installation of Two PV Power Stations for LOFOS ENERGY COMMUNITY

PROJECT SUMMARY

MES ENERGY S.A. undertook, on behalf of LOFOS ENERGY COMMUNITY, the development, study, procurement and installation of two PV Power Stations, with a capacity of 0.5 MW each, along with all the the necessary preparatory work to ensure that the Stations are ready to operate productively. 

The Stations were installed at the locations “Gyra” and “Trichinos” in the broader area of the Regional Unit of Aetolia-Acarnania. The project was completed within the specified time limits and in accordance with Greek and International standards (ΕΛΟΤ, IEC). 

 

PROJECT DATA

  • Total power 1MW
  • Locations "Gyra" and "Trichinos"
  • LOFOS ENERGY COMMUNITY