MES ENERGY S.A. undertook, on behalf of ARGOLIKI ENERGY COMMUNITY Ltd., the development, study, procurement, installation, and commissioning of a PV Power Station, with a total capacity of 999.46 kWp. The Station was installed at the location “Choma”, in the Municipality of Argos-Mykines, at the Regional Unit of Argolis.
The project was completed within the specified time limits and in accordance with Greek and International standards (ΕΛΟΤ, IEC). It was successfully commissioned on Monday, May 15, 2022. After the 30-day trial operation, the Station now operates smoothly, while its energy performance is continuously monitored through an electronic control and supervision system.